My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4 SR 04-05-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
04-05-2021
>
4.4 SR 04-05-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2021 8:55:47 AM
Creation date
4/2/2021 8:20:55 AM
Metadata
Fields
Template:
City Government
type
CCM
date
4/5/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Michael Van Alst <br />NOT Technician • American Engineering Testing, Inc. <br />Education <br />American Engineering Testing In -House Training Program <br />Ridgewater College, Hutchinson, MN; Ultrasonic Training <br />Registration/ Certification <br />Ultrasonic, Level II <br />Magnetic Particle, Level II <br />Penetrant, Level II <br />Radiography, Level II <br />IRRSP 210324 <br />American Welding Society, Certified Welding Inspector <br />Certified Climber/Rescuer <br />NACE, Level II <br />ICC, Structural Steel and Bolting <br />Employment <br />AMERICAN ENGINEERING TESTING, INC. — Technician Nondestructive Testing Department/Level II. <br />Responsibilities include nondestructive testing in a variety of applications to code(s) and client's <br />requirements. Quality control, welding, and bolting. ASME and AWS Code Inspections. July 2006 - <br />Present. <br />Professional Memberships <br />American Society of Nondestructive Testing <br />American Welding Society <br />Project Experience <br />Flint Hills Resources Refinery — Radiographic Inspection <br />Faribault Energy Center <br />Xcel King Plant <br />Flint Hills Resources Refinery — QC Tank and Piping Inspection <br />Minnesota Power and Light— QC Tank Inspection <br />Mid America Energy <br />Dairyland Power — Genoa, WI <br />❑airyland Power — Alma, WI <br />Xcel Wilmarth Plant <br />MnDaT Radio Communication Towers <br />Xcel Red Wing Plant <br />Bill Snyder Family Stadium Expansion <br />Flickertail Pipeline — North Dakota <br />Industrial Steel Construction — Gary, IN <br />VC Summer <br />Mox Damper <br />Takeda Pharmaceutical <br />Lifecore Vial Filling and Packaging <br />Xcel Blackdog Facility <br />Fueling Facility Improvements — Camp Ripley, MN <br />Trinity Meyer <br />10/20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.