My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.1 ERMUSR 03-31-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2021
>
03-31-2021 SPECIAL
>
2.1 ERMUSR 03-31-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2021 4:13:37 PM
Creation date
3/26/2021 4:09:01 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/31/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
category 5A—Structural Steel Material to RJM. The remainder of the bid and quote categories <br /> will be considered at the regular commission meeting on April 13. <br /> FINANCIAL IMPACT: <br /> The attached project budget includes the preliminary bid tabulation and all soft costs expected <br /> for this project. Additional allowances and contingencies have been included due to the <br /> schedule shift to account for possible winter weather delays. Staff is planning to evaluate the <br /> contingency amounts at the end of earthwork, and if necessary budget for any amount above <br /> the $13.5 million in the 2022 capital budget. The final budget and GMP will be presented at the <br /> regular commission meeting on April 13. <br /> ATTACHMENTS: <br /> • Letter of Recommendation from RJM Construction —Award of Bid Category 5A—Steel <br /> Material <br /> • Bid Tabulation for Bid Category 5A—Steel Material <br /> • Project Budget Estimate from Kodet Architectural Group <br /> • Resolution No. 21-3 Approving Assignment of Construction Contract to RJM <br /> Construction for the ERMU Field Services Facility Project <br /> Page 2 of 2 <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.