My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. PCSR 03-23-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2021
>
03-23-2021
>
6.2. PCSR 03-23-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2021 12:32:37 PM
Creation date
3/18/2021 12:14:41 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
3/23/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of <br /> Elk <br /> *==1 <br /> River <br /> 13065 Orono Parkway <br /> Elk River,MN 55330 <br /> March 5,2021 <br /> Steve Rohlf VIA EMAIL: srohEkgornerstoneauto.com <br /> 17094 Vance St NW pigs inc e,hotmail.com <br /> Elk River,MN 55330 <br /> RE:Preliminary and Final Plat Application Complete <br /> Dear Mr.Rohlf, <br /> Thank you for your applications for a Preliminary and Final Plat to subdivide property located at 18990 Twin <br /> Lakes Road. I will be reviewing your application and preparing the staff report for the Planning Commission <br /> and City Council. <br /> On February 22,2021,the city received your application for the above use. Per state statute 15.99,the city is <br /> required to make a decision within 60 days of receipt of the completed application. Subdivision 3 of that <br /> section requires the city to notify an applicant within 15 business days if information is missing,delaying the <br /> start of the 60 day review period. A city may extend the 60 day review period up to 120 days to complete the <br /> review. <br /> With the receipt of the required materials on February 22,2021,your applications have been deemed <br /> complete,and the 60 day review period starts. These applications have been assigned Case Number P 21-03 <br /> and are scheduled to be reviewed by the Planning Commission on March 23,2021,at 6:30 p.m.at the Elk <br /> River City Hall, 13065 Orono Parkway. With a Planning Commission recommendation on that date,the City <br /> Council will review your applications no earlier than April 19,2021. <br /> Staff conducted a thorough site plan review on March 1,2021,and has the following comments: <br /> Sherburne County <br /> ■ No concerns with the proposed preliminary Plat. <br /> ■ Removal of the driveway adjacent to CSAH 13 will be a requirement for County approval. <br /> ■ Additionally,Sherburne County is proposing improvements to CSAH 13/Twin Lakes Road at the <br /> Tyler street intersection,beginning in July of 2021. <br /> ■ Coordination of development work involving utility construction in and under CSAH 13 project <br /> limits will be required to be completed concurrently to avoid any cutting into brand new pavement <br /> placed with the CSAH 13 road construction project. <br /> City Comments <br /> ■ Add sidewalk to one side new streets and add trail along west side of Tyler Street from Twin Lakes <br /> Road to northern extent of subject project. The grading of lot 1 block 3 will need to be adjusted. <br /> ■ ADA compliant pedestrian ramps required at crossings. <br /> ■ Consider future decks/patios when establishing building pads.Decks are considered principal <br /> structures and must meet rear yard and wetland setback standards. <br /> ■ Driveway on lot 5 block 1 may need to move pending County project. <br /> ■ Concrete flex mat to be used at all outlets per standard plate. <br /> ParIRIU 0 <br /> Phone: 763.635.1000 /�M UREJ <br /> www.ElkRiverMN.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.