My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-01-2021 HRA MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Minutes
>
2020-2029
>
2021
>
02-01-2021 HRA MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2021 12:42:15 PM
Creation date
3/16/2021 12:42:03 PM
Metadata
Fields
Template:
City Government
type
HRM
date
2/1/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Housing and Redevelopment Minutes Page 3 <br />February 9, 2029 <br />Moved by Commissioner Ovall and seconded by Commissioner Swenson to re- <br />appoint Larry Toth as an HRA Representative to the HRA/EDA Joint Finance <br />Committee. <br />Motion carried 5-0. <br />Ms. Eddy asked if there were any new committee assignments or new committees. There <br />were currently no recommendations by the HRA. <br />7.3 Main and Gates Redevelopment Update <br />Ms. Eddy presented the staff report. She requested the HRA schedule a work session to <br />discuss their vision for this area as the city is receiving a lot of interest. She explained the <br />HRA can discuss what they want to see here and provide an opportunity for discussion. She <br />distributed the Mississippi Connections map for the HRA to review prior to the work <br />session. <br />Commissioner Wagner asked how much time Ms. Eddy thought was needed as she felt <br />holding a work session prior to the regular meeting would not allow them the time to be <br />thorough and not feel rushed. <br />Chair Toth also preferred to have it on a date different than before a regular meeting. <br />Mr. Portner stated the commission should allow some time to think about the Mississippi <br />Connections Plan and how it guides this area. He suggested waiting until after the special <br />joint meeting on February 22, where they along with the community will discuss and develop <br />the downtown redevelopment vision and the HRA can then see how that will connect to <br />this area. <br />It was the consensus of the commission to hold a special work session on Thursday, Feb. 25 <br />from 4:00 p.m. to 6:00 p.m. <br />Commissioner Wagner asked if there had been any additional marketing of the site besides <br />the sign. <br />Ms. Eddy stated a recent article was published in the Elk River Star News and a future <br />developer forum will be scheduled as soon as able. <br />Commissioner Wagner suggested utilizing Linkedln to advertise this site rather than <br />Facebook. <br />7.4 HRA Rehabilitation Loan Update <br />Ms. Eddy presented the staff report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.