My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 03-15-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
03-15-2021
>
8.2. SR 03-15-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2021 10:44:46 AM
Creation date
3/12/2021 10:44:00 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/15/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Houseal Lavigne | Elk River Downtown Subarea Plan Page 3 of 4 <br />• 2c: Study Documentation <br />o Draft Report <br />o Final Report <br />Task 3: Downtown Subarea Frameworks <br />We will prepare preliminary Downtown Subarea Frameworks based on field <br />reconnaissance, research, and feedback provided during outreach. Using a series of <br />Frameworks, the Downtown Subarea Plan will address land use and development, <br />priority development opportunity sites, urban design, river connections, transportation <br />and circulation, parking, and streetscape. Each Framework will address surrounding <br />neighborhoods to indicate how the Downtown Subarea Plan should interact with those <br />areas moving forward. <br />• 3a: Land Use & Development Framework <br />• 3b: Transportation & Circulation Framework <br />• 3c: Urban Design & Streetscape Framework <br />• 3d: Staff Review <br />• 3e: Downtown Subarea Plan Advisory Committee Presentation (Mtg #2) <br />Note: This proposal includes three optional tasks including Origin-Destination Data and <br />Interpretation (to address one-way streets in greater detail), Downtown Parking Study <br />and Downtown Pedestrian Bridge Location Study. <br />Task 4: Final Downtown Subarea Plan <br />Based on the previous tasks in the planning process, the draft version of the Downtown <br />Subarea Plan will be prepared and presented for review. <br />• 4a: Draft Downtown Subarea Plan <br />• 4b: Downtown Regulatory Strategies <br />• 4c: Staff Review of Downtown Subarea Plan <br />• 4d: Final Downtown Subarea Plan <br />• 4e: Comprehensive Plan Integration
The URL can be used to link to this page
Your browser does not support the video tag.