Laserfiche WebLink
6. Submit lighting plans for review and comment. Review and approval of the lighting plan must <br />be done prior to recording the CUP or releasing the plat for recording. <br />7. Staff approval of material/color selections along with final building elevations will be <br />required prior to recording the CUP or releasing the plat for recording. Disagreements <br />between staff and the applicant will be discussed with the City Council as part of the <br />approval for the PUD agreement. <br />8. Proposed signage must be included on final site plans and elevations. <br />9. As both buildings proposed to be sprinkled, the fire lanes along the back of building are not <br />required. The fire lanes should be removed to accommodate the recommended trail <br />easement from the park and recreation commission. <br />■ Please address this change on future updates. <br />10. The existing stormwater pipes that convey water from Zane Street through the site must <br />remain in a drainage and utility easement. <br />■ Update the plat to include the appropriate drainage and utility easement. <br />11. A formal agreement for the proposed shared storm sewer system between the two <br />properties must be formalized in an easement and agreement. <br />■ Staff can review this prior to releasing the plat for recording. <br />12. Please submit a turning radius exhibit demonstrating a right -turn from the north exit <br />for the parking lot in front of phase 2. <br />13. Eliminate the northern most parking stall from the lot in front of phase 2 (includes a <br />number "9") and the eastern most stall in the lot north of phase 2 (includes a number <br />"17). Adjust the curb and sidewalks appropriately. There should be as much buffer as <br />possible between the R/W and the sidewalks to accommodate snow storage for the <br />cul-de-sac. <br />14. Stormwater management requirements need to be met as listed in Ordinance Sec. 78-503. <br />- Stormwater and urban runoff control. and Sec. 78-504. - Post construction <br />stormwater management for proposed impervious surfaces. http://mn-\ <br />elkriver.civicplus.com/Document Center/View/3180. <br />■ The stormwater plans continue to be reviewed by the engineering department <br />and additional comments may follow when their review is complete. <br />15. Submitted plans note that proposed hardcover is 26.7%. City ordinances limit the <br />hardcover to 25% for areas within the wild and scenic river district. The deviation can <br />be approved by the Planning Commission and Council through the PUD process. <br />Changes to the submitted site plan may be required after their review. <br />16. Section 30-2022 requires a 30-foot setback from the top -of -bluff. Plans identify <br />parking and drive lane setbacks into this easement. The deviation can be approved by <br />the Planning Commission and Council through the PUD process. Changes to the <br />