Terra Tara Project Number 20.700 <br />ir,Elk Riva Public SEfety BuiI ding Exports on <br />Ci ty of Elk Riva <br />CONTINUATION SHEET AIA DOCUMENT G703 <br />AtA Document G702, AP PUCATtON AND CERTIFICATION FOR PAYMENT, containing APPLICATION N0: 5 <br />Contractor's signed certification is attached. APPLICATION DATE: 2/28/21 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 2/28/21 <br />A <br />A <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D E <br />E <br />6 <br />H <br />t <br />SUBCONTRACTOR <br />ITEM <br />BiD <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAtNAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />FROM PREVIOUS <br />THIS PERIOD <br />PRESENTLY <br />COMPLETED <br />(G+C) <br />TO FtNtSH <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C-G) <br />COST <br />TRANSFER <br />(D+E) <br />(NOTIN <br />TO DATE <br />CODE <br />D OR E) <br />(D+E+F) <br />Preconstruction <br />01-0002 <br />Preconstruction <br />$ 10100Goo <br />$ 10,000.00 <br />$ 10,000.00 <br />$ - <br />$ 10,000.00 <br />100m% <br />$ - <br />$ 500.00 <br />Bonds <br />01-0110 <br />Bonds&Insuance <br />$ 79,52&GG <br />$ 79,52&GG <br />$ 62,253.00 <br />$ 4,789.00 <br />$ 67,042.00 <br />84.30% <br />$ 12,486.00 <br />$ 3,352.10 <br />Permits <br />01-0120 <br />Building Permit/SAC/WAC/SWPPP <br />$ 127,156.00 <br />$ 127,156.00 <br />$ 400.00 <br />$ - <br />$ 400.00 <br />0.31% <br />$ 126,756.00 <br />$ 20.00 <br />CM General Requirements <br />CM General Requirements <br />$ 789,795.50 <br />$ 13,371.50 <br />$ 803,16TOG <br />$ 230,459.68 <br />$ 75,60695 <br />$ 306,066.63 <br />38.11% <br />$ 497,100.37 <br />$ 15,303.33 <br />CM Contingency <br />01-0150 <br />CM Contingency <br />$ 238,379.00 <br />$ (52,680.20) <br />$ 185,698BG <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 185,698B0 <br />$ - <br />CM Fee <br />CM Fee <br />$ 92,372.00 <br />$ 92,372.00 <br />$ 17,514.66 <br />$ 14,830.00 <br />$ 32,344.66 <br />35.02% <br />$ 60,027.34 <br />$ 1,617.23 <br />Envirobate <br />02-2070 <br />2A <br />Selective Demolition <br />$ 132,619.00 <br />$ - <br />$ 132,619.00 <br />$ 35,000.00 <br />$ 50,326.16 <br />$ 85,326.16 <br />64.34% <br />$ 47,292B4 <br />$ 4,266.31 <br />Envirobate <br />02-2070 <br />2A <br />CON7 PRN2R Add demo <br />$ - <br />$ 2,856.00 <br />$ 2,856.00 <br />$ - <br />$ 2,856.00 <br />$ 2,856.00 <br />100.00% <br />$ - <br />$ 142BG <br />Envirobate <br />02-2070 <br />2A <br />CON2 REINS <br />$ - <br />$ 910.00 <br />$ 910.00 <br />$ - <br />$ 910.00 <br />$ 910.00 <br />100.00% <br />$ - <br />$ 45.50 <br />Envirobate <br />02-2070 <br />2A <br />CON3 RFlN17 <br />$ - <br />$ 1,164.00 <br />$ 1,164.00 <br />$ - <br />$ 1,164.00 <br />$ 1,164.00 <br />100.00% <br />$ - <br />$ 58.20 <br />Envirobate <br />02-2070 <br />2A <br />CON4 RFlN21 <br />$ - <br />$ (1,212.00) <br />$ (1,212.00) <br />$ - <br />$ (1,212.00) <br />$ (1,212.00) <br />100.00% <br />$ - <br />$ (60.60) <br />Ebert <br />03-3300 <br />3A <br />General Conditions <br />$ 22,866.00 <br />$ - <br />$ - <br />$ 22,866.00 <br />$ 9,36TOG <br />$ 2,678.81 <br />$ 12,045.81 <br />52.68% <br />$ 10,82019 <br />$ 602.29 <br />Ebert <br />03-3300 <br />3A <br />Bonds&Insurance <br />$ 6,200.00 <br />$ - <br />$ - <br />$ 6,200.00 <br />$ 61200.00 <br />$ 6,200.00 <br />100.00% <br />$ - <br />$ 310.00 <br />Ebert <br />03-3300 <br />3A <br />Rebar&Accessories <br />Material <br />$ 50,400.00 <br />$ - <br />$ - <br />$ 50,400.00 <br />$ 50,400.00 <br />$ 50,400.00 <br />100.00% <br />$ - <br />$ 2,520.00 <br />Ebert <br />03-3300 <br />3A <br />Area A Found <br />Labor <br />$ 35,550.00 <br />$ - <br />$ - <br />$ 35,550.00 <br />$ 29,59&GG <br />$ 29,59&GG <br />83.26% <br />$ 5,952.00 <br />$ 1,47990 <br />Ebert <br />03-3300 <br />3A <br />Area A Found <br />Material <br />$ 31,521.00 <br />$ - <br />$ - <br />$ 31,521.00 <br />$ 28,033.00 <br />$ 28,033.00 <br />8893% <br />$ 3,48&GG <br />$ 1,401.65 <br />Ebert <br />03-3300 <br />3A <br />Area A SOO <br />Labor <br />$ 27,900.00 <br />$ - <br />$ - <br />$ 27,900.00 <br />$ - <br />$ 10,77219 <br />$ 10,77219 <br />3&61% <br />$ 17,127B1 <br />$ 53&61 <br />Ebert <br />03-3300 <br />3A <br />Area A SOO <br />Material <br />$ 40,57TOG <br />$ - <br />$ - <br />$ 40,57TOG <br />$ - <br />$ 18,651.00 <br />$ 18,651.00 <br />4596% <br />$ 21,926.00 <br />$ 932.55 <br />Ebert <br />03-3300 <br />3A <br />Area A Top Slabs <br />Labor <br />$ 4,800.00 <br />$ - <br />$ - <br />$ 4,800.00 <br />$ - <br />$ - <br />0.00% <br />$ 4,80000 <br />$ - <br />FIB- <br />03-3300 <br />3A <br />Area A Top Slabs <br />Material <br />$ 3,814.00 <br />$ - <br />$ - <br />$ 3,814.00 <br />$ - <br />$ 1,113.00 <br />$ 1,113.00 <br />29.18% <br />$ 2,701C0 <br />$ 55.65 <br />Ebert <br />03-3300 <br />3A <br />Area CFound <br />Labor <br />$ 33,900.00 <br />$ - <br />$ - <br />$ 33,900.00 <br />$ 33,900.00 <br />$ 33,900.00 <br />100.00% <br />$ - <br />$ 1,695.00 <br />Ebert <br />03-3300 <br />3A <br />Area CFound <br />Material <br />$ 26,241.00 <br />$ - <br />$ - <br />$ 26,241.00 <br />$ 26,241.00 <br />$ 26,241.00 <br />100.00% <br />$ - <br />$ 1,312.05 <br />Ebert <br />03-3300 <br />3A <br />Area C SOO <br />Labor <br />$ 41,400.00 <br />$ - <br />$ - <br />$ 41,400.00 <br />$ - <br />$ - <br />0.00% <br />$ 41,40000 <br />$ - <br />FIB- <br />03-3300 <br />3A <br />Area CSOO <br />Material <br />$ 71,919.00 <br />$ - <br />$ - <br />$ 71,919.00 <br />$ - <br />$ 14,038.59 <br />$ 14,038.59 <br />19.52% <br />$ 57,88GA1 <br />$ 70193 <br />Ebert <br />03-3300 <br />3A <br />Exterior Concrete <br />Labor <br />$ 8,700.00 <br />$ - <br />$ - <br />$ 8,700.00 <br />$ - <br />$ - <br />0.00% <br />$ 8,70000 <br />$ - <br />FIB- <br />03-3300 <br />3A <br />Exteri or Con Crete <br />Material <br />$ 7,412.00 <br />$ - <br />$ - <br />$ 7,412.00 <br />$ - <br />$ - <br />0.00% <br />$ 7,412C0 <br />$ - <br />FIB- <br />03-3300 <br />32D <br />General Conditions <br />$ 5,200.00 <br />$ - <br />$ - <br />$ 5,200.00 <br />$ 824.00 <br />$ 351.20 <br />$ 1,175.20 <br />22.60% <br />$ 4,024BG <br />$ 58.76 <br />Ebert <br />03-3300 <br />32D <br />Bond&Insurance <br />$ 1,181.00 <br />$ - <br />$ - <br />$ 1,181.00 <br />$ 1,181.00 <br />$ 1,181.00 <br />100.00% <br />$ - <br />$ 59.05 <br />Ebert <br />03-3300 <br />32D <br />Rebar&Accessories <br />$ 2,885.00 <br />$ - <br />$ - <br />$ 2,885.00 <br />$ 2,885.00 <br />$ 2,885.00 <br />100.00% <br />$ - <br />$ 144.25 <br />Ebert <br />03-3300 <br />32D <br />Curb & Gutter, <br />$ 38,784.00 <br />$ - <br />$ - <br />$ 38,784.00 <br />$ - <br />$ - <br />0.00% <br />$ 38,784C0 <br />$ - <br />FIB- <br />03-3300 <br />32D <br />Site Concrete <br />Labor <br />$ 13,100.00 <br />$ - <br />$ - <br />$ 13,100.00 <br />$ - <br />$ - <br />0.00% <br />$ 13,100.00 <br />$ - <br />FIB- <br />03-3300 <br />32D <br />Site Concrete <br />Material <br />$ 10,219.00 <br />$ - <br />$ - <br />$ 10,219.00 <br />$ - <br />$ - <br />0.00% <br />$ 10,219.00 <br />$ - <br />FIB- <br />03-3300 <br />32D <br />Existing Walk Rep <br />Labor <br />$ 4,800.00 <br />$ - <br />$ - <br />$ 4,800.00 <br />$ - <br />$ - <br />0.00% <br />$ 4,80000 <br />$ - <br />FIB- <br />03-3300 <br />32D <br />Existing Walk Rep <br />Material <br />$ 2,531.00 <br />$ - <br />$ - <br />$ 2,531.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,531CO <br />$ - <br />FIB- <br />03-3300 <br />32D <br />CON1 Eli rate to su lati on at foundation <br />$ - <br />$ - <br />$ (1,143.06) <br />$ (1,143.06) <br />$ - <br />$ (1,143.06) <br />$ (1,143.06) <br />100.00% <br />$ - <br />$ (57.15) <br />Ebert <br />03-3300 <br />32D <br />CON2 PRN2R Thickened Footing <br />$ - <br />$ - <br />$ 2,037.71 <br />$ 2,037.71 <br />$ - <br />$ 2,037.71 <br />$ 2,037.71 <br />100.00% <br />$ - <br />$ 101.89 <br />Ebert <br />03-3300 <br />32D <br />CON3 REIN21 <br />$ - <br />$ - <br />$ 2,240.08 <br />$ 2,240.08 <br />$ - <br />$ 2,240.08 <br />$ 2,240.08 <br />100.00% <br />$ - <br />$ 112.00 <br />Ebert <br />03-3300 <br />32D <br />CON4 PRN03 <br />$ - <br />$ - <br />$ 20.09 <br />$ 20.09 <br />$ - <br />$ 20.09 <br />$ 20.09 <br />100.00% <br />$ - <br />$ 1.00 <br />Ebert <br />03-3300 <br />32D <br />CONS ASI 1 <br />$ - <br />$ - <br />$ 3,585.12 <br />$ 3,585.12 <br />$ - <br />$ - <br />0.00% <br />$ 3,585.12 <br />$ - <br />Huffcut <br />03-3400 <br />3B <br />Precast -Police Squad <br />$ 260,826.00 <br />$ - <br />$ - <br />$ 260,826.00 <br />$ - <br />$ 260,826.00 <br />$ 260,826.00 <br />100.00% <br />$ - <br />$ 13,041.30 <br />Huffcut <br />03-3400 <br />3B <br />Precast -Fire Dept <br />$ 17,700.00 <br />$ - <br />$ - <br />$ 17,700.00 <br />$ - <br />$ - <br />0.00% <br />$ 17,70000 <br />$ - <br />Concrete Treatments <br />03-3350 <br />3C <br />Polished Concrete <br />$ 12,360.00 <br />$ - <br />$ - <br />$ 12,360.00 <br />$ - <br />$ - <br />0.00% <br />$ 12,36000 <br />$ - <br />B&D Associates <br />04-4200 <br />4A <br />ED-Addition/Remodrl 034500 L <br />Labor <br />$ 3,000.00 <br />$ - <br />$ - <br />$ 3,000.00 <br />$ - <br />$ 1,000.00 <br />$ 1,000.00 <br />33.33% <br />$ 2,000.00 <br />$ 50.00 <br />B&D Associates <br />04-4200 <br />4A <br />ED-Addition/Remodrl 034500 M <br />Material <br />$ 4,020.00 <br />$ - <br />$ - <br />$ 4,020.00 <br />$ - <br />$ 4,020.00 <br />$ 4,020.00 <br />100.00% <br />$ - <br />$ 201.00 <br />B&D Associates <br />04-4200 <br />4A <br />ED-Addition/Remodrl 042000 L <br />Labor <br />$ 179,900.00 <br />$ - <br />$ - <br />$ 179,900.00 <br />$ 64,700.00 <br />$ 11,300.00 <br />$ 76,000.00 <br />42.25% <br />$ 103,900.00 <br />$ 3,800.00 <br />B&D Associates <br />04-4200 <br />4A <br />ED-Addition/Remodrl 042000 M <br />Material <br />$ 107,800.00 <br />$ - <br />$ - <br />$ 107,800.00 <br />$ 28,600.00 <br />$ 21,200.00 <br />$ 49,800.00 <br />46.20% <br />$ 58,00000 <br />$ 2,490.00 <br />B&D Associates <br />04-4200 <br />4A <br />PO-Addition/Remodrl G42000L <br />Labor <br />$ 41,000.00 <br />$ - <br />$ - <br />$ 41,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 41,000.00 <br />$ - <br />B&D Associates <br />04-4200 <br />4A <br />PO-Addition/Remodrl 042000M <br />Material <br />$ 35,180.00 <br />$ - <br />$ - <br />$ 35,180.00 <br />$ - <br />$ - <br />0.00% <br />$ 35,18000 <br />$ - <br />B&D Associates <br />04-4200 <br />4A <br />CON7 RFlN21 <br />$ - <br />$ - <br />$ 371.00 <br />$ 371.00 <br />$ - <br />$ 371.00 <br />$ 371.00 <br />100.00% <br />B&D Associates <br />04-4200 <br />4A <br />CON2 REIN41 <br />$ - <br />$ - <br />$ 2,320.00 <br />$ 2,320.00 <br />$ - <br />$ 2,320.00 <br />$ 2,320.00 <br />100.00% <br />$ - <br />$ 116.00 <br />B&D Associates <br />04-4200 <br />4A <br />Backcharge Joist Pockets <br />$ - <br />$ - <br />$ (482.76) <br />$ (482.76) <br />$ - <br />$ (482.76) <br />$ (482.76) <br />110.00% <br />(24.14) <br />Ben's Structural Fab <br />05-5120 <br />5A <br />Steel Supplier- Structural Steel <br />$ 51,161B8 <br />$ - <br />$ - <br />$ 51,161.88 <br />$ 51, 161.88 <br />$ 51, 161.88 <br />100C <br />$ - <br />$ 2,558.09 <br />Ben's Structural Eab <br />05-5120 <br />5A <br />Steel Supplier -Joist <br />$ 53,937.50 <br />$ - <br />$ - <br />$ 53,937.50 <br />$ 53,937.50 <br />$ 53,937.50 <br />100.00% <br />$ - <br />$ 2,696.88 <br />Pale 1 6 SPC East T- - T- P, APP <br />