Laserfiche WebLink
20.705 <br />TerraProjectRiot Numbertion#3 <br />r Terra Elk River Fire Station #3 <br />City of EJk Riva <br />CONTINUATION SHEET AIA DOCUMENT G703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 1 <br />Contractor's signed certification is attached. APPLICATION DATE: 2/28/21 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 2/28/21 <br />Use Column I on Contracts where variable retainage for tine items may apply. <br />A A.1 B C CA C.2 C.3 D E F G H I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />PRESENTLY <br />COMPLETED <br />(G -C) <br />TO FINISH <br />(IF VARIABLE <br />FROM PREVIOUS <br />THIS PERIOD <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />ANDSTORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOTIN <br />TO DATE <br />CODE <br />DOR E) <br />(D+E+F) <br />Preconstruction <br />01-0002 <br />Preconstruction <br />$ 10,000.00 <br />$ 10,000.00 <br />$ - <br />$ 10,000.00 <br />$ 10,000.00 <br />100.00% <br />$ - <br />$ 500.00 <br />Bonds & Insurance <br />01-0100 <br />Bonds & Insurance <br />$ 76,368.00 <br />$ 76,368.00 <br />$ - <br />$ 51,839.00 <br />$ 51,839.00 <br />67.88% <br />$ 24,529.00 <br />$ 2,591.95 <br />Permit <br />01-0110 <br />Permit <br />$ 400.00 <br />$ 400.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 400.00 <br />$ - <br />CM Generat Requirements <br />01-0120 <br />CM Generat Requirements <br />$ 724,061.00 <br />$ 724,061.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 724,061.00 <br />$ - <br />CM Contingency <br />01-0130 <br />CM Contingency <br />$ 233,000.00 <br />$ (87,196.25) <br />$ 145,803.75 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 145,803.75 <br />$ - <br />CM Fee <br />01-0150 <br />CM Fee <br />$ 101,734.00 <br />$ 101,734.00 <br />$ - <br />$ 915.61 <br />$ 915.61 <br />0.90% <br />$ 100,818.39 <br />$ 45.78 <br />Thomsen Construction Services <br />03-3300 <br />3A <br />Concrete <br />$ 348,900.00 <br />$ - <br />$ - <br />$ 348,900.00 <br />$ - <br />$ - <br />0.00% <br />$ 348,900.00 <br />$ - <br />Concrete Treatments <br />03-3350 <br />3B & 9E <br />Potished Concrete and Resinous Ftooring <br />$ 73,189.00 <br />$ - <br />$ - <br />$ 73,189.00 <br />$ - <br />$ - <br />0.00% <br />$ 73,189.00 <br />$ - <br />Uttra Concrete <br />03-3390 <br />32D <br />Curb, Gutter & Sidewalks <br />$ 220,000.00 <br />$ - <br />$ - <br />$ 220,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 220,000.00 <br />$ - <br />Camco Construction <br />04-4200 <br />4A <br />Masonry <br />$ 1,115,000.00 <br />$ - <br />$ - <br />$ 1,115,000.00 <br />$ - <br />$ - <br />0.00% <br />$1,115,000.00 <br />$ - <br />Distinctive Iron <br />05-5120 <br />5A <br />Structurat Steet Materiat <br />$ 295,760.00 <br />$ - <br />$ 87,196.25 <br />$ 382,956.25 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 382,956.25 <br />$ - <br />Patriot Erectors <br />05-5121 <br />5B <br />Structurat Steet Erection <br />$ 58,000.00 <br />$ - <br />$ - <br />$ 58,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 58,000.00 <br />$ - <br />Patriot Erectors <br />05-5121 <br />5B <br />Joists & Decking <br />$ 29,575.00 <br />$ - <br />$ - <br />$ 29,575.00 <br />$ - <br />$ - <br />0.00% <br />$ 29,575.00 <br />$ - <br />Patriot Erectors <br />05-5121 <br />5B <br />Metat Fabrications <br />$ 26,175.00 <br />$ - <br />$ - <br />$ 26,175.00 <br />$ - <br />$ - <br />0.00% <br />$ 26,175.00 <br />$ - <br />Patriot Erectors <br />05-5121 <br />5B <br />Bond <br />$ 4,000.00 <br />$ - <br />$ - <br />$ 4,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 4,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Performance & Payment Bond <br />$ 6,400.00 <br />$ - <br />$ - <br />$ 6,400.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 6,400.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Attowance <br />$ 10,000.00 <br />$ - <br />$ - <br />$ 10,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 10,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Mobitization <br />$ 3:100.00 <br />$ - <br />$ - <br />$ 3:100.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 3,100.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Materiats <br />$ 97,000.00 <br />$ - <br />$ - <br />$ 97,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 97,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Materiat Btocking <br />$ 12,000.00 <br />$ - <br />$ - <br />$ 12,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 12,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Install Roof Btocking <br />$ 43,000.00 <br />$ - <br />$ - <br />$ 43,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 43,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Install In Watt Btocking <br />$ 8,000.00 <br />$ - <br />$ - <br />$ 8,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 8,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Cabinets and Mittwork <br />$ 8,500.00 <br />$ - <br />$ - <br />$ 8,500.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 8,500.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Speciatties <br />$ 32,000.00 <br />$ - <br />$ - <br />$ 32,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 32,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Temp Enclosures <br />$ 6,000.00 <br />$ - <br />$ - <br />$ 6,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 6,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Doors & Hardware <br />$ 17,000.00 <br />$ - <br />$ - <br />$ 17,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 17,000.00 <br />$ - <br />Northern Woodwork <br />06-6400 <br />6B <br />Architecturat Mittwork <br />$ 45,900.00 <br />$ - <br />$ - <br />$ 45,900.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 45,900.00 <br />$ - <br />Herzog Coatings <br />07-7210 <br />7C <br />Ftuid Applied Air Barrier <br />$ 38,600.00 <br />$ - <br />$ - <br />$ 38,600.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 38,600.00 <br />$ - <br />Horizon Roofing <br />07-7520 <br />7A & 7B <br />Roofing & Metat Watt Panets <br />$ 385,124.00 <br />$ - <br />$ - <br />$ 385,124.00 <br />$ - <br />$ - <br />0.00% <br />$ 385,124.00 <br />$ - <br />Sunrise Speciatity <br />07-7900 <br />7D <br />Joint Seatants <br />$ 45,470.00 <br />$ - <br />$ - <br />$ 45,470.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 45,470.00 <br />$ - <br />Mid-Centrat Door <br />08-8200 <br />8A <br />Doors & Frames <br />$ 41,875.33 <br />$ - <br />$ - <br />$ 41,875.33 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 41,875.33 <br />$ - <br />Mid-Centrat Door <br />08-8200 <br />8A <br />Wood Doors <br />$ 7,727.00 <br />$ - <br />$ - <br />$ 7,727.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 7,727.00 <br />$ - <br />Mid-Centrat Door <br />08-8200 <br />8A <br />Staintess Steet Doors & Frames <br />$ 3,133.00 <br />$ - <br />$ - <br />$ 3,133.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 3,133.00 <br />$ - <br />Mid-Centrat Door <br />08-8200 <br />8A <br />Hardware <br />$ 41,653.67 <br />$ - <br />$ - <br />$ 41,653.67 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 41,653.67 <br />$ - <br />American Door Works <br />08-8361 <br />8B <br />Sectionat Overhead Doors <br />$ 170,570.00 <br />$ - <br />$ - <br />$ 170,570.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 170,570.00 <br />$ - <br />Pase 1 / 2 <br />