My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1g ERMUSR 03-09-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2021
>
03-09-2021
>
6.1g ERMUSR 03-09-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2021 12:06:13 PM
Creation date
3/8/2021 12:06:13 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/9/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTILITIES COMMISSION MEETING <br />TO:FROM: <br />ERMU Commission Thomas Geiser – Operations Director <br />MEETING DATE: AGENDA ITEM NUMBER: <br />March 9th, 2021 6.1g <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br /> Staff continues to have meetings with T2Utility Engineers, WSB Engineering, and <br />MnDOTfor the upcoming Highway169 Redefine project. ERMU has received the Notice <br />and Order from MnDOT which authorizes usto start obtaining material and contact the <br />State’s assigned engineer to schedule relocationand/or adjustment work for the water <br />and electric infrastructure. <br /> <br /> Staff has had meetings with the County and Bolton & Menk, Inc.to review 60% plans for <br />the County Road 13 Project, which will bring roundabouts toLineAvenue and Tyler <br />Street. <br /> <br /> Participated in a pre-construction meeting with city staff and Bolton & Menk, Inc. for <br />rd <br />the Windsor Park 3 addition sewer service extension. <br /> <br /> Working with the owners of the refuse-derived fuel processing plant and Great River <br />Energy (GRE) to make the transition from GRE’s 69-kilovolt transmission line to ERMU’s <br />distribution grid. <br /> <br />Bids for the FieldService BuildingExpansion projectwent outonFebruary26. The bid <br />opening will occur on March 24. <br /> <br />Working withMnDOT to coordinate thetimingof taking down streetlightsfrom Proctor <br />Roadto Lowell Avenuefor the Highway 10reconstructionproject. <br /> <br />______________________________________________________________________________ <br />Page 1 of 1 <br />369 <br />
The URL can be used to link to this page
Your browser does not support the video tag.