My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1b ERMUSR 03-09-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2021
>
03-09-2021
>
4.1b ERMUSR 03-09-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 3:54:31 PM
Creation date
3/5/2021 3:54:31 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/9/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTILITIES COMMISSION MEETING <br />TO: FROM: <br />ERMU Commission Chris Kerzman –Engineering Manager <br />MEETING DATE: AGENDA ITEM NUMBER: <br />February 9, 2021 5.4 <br />SUBJECT: <br />Field Services Facility Expansion Project – Plans, Project Estimate, and Construction <br />Management Contract <br />ACTION REQUESTED: <br />Authorize staff to solicit for public bids on the Field Services Expansion Project contingent upon <br />staff review and approval of bid documents. <br />Approve the A133 contract with RJM for construction management services. <br />BACKGROUND: <br />Staff is continuing to workwith Kodet Architectural Group, Ltd.and RJMConstructionon plans <br />for the Field Services Facility.The design is currently in the construction documents(CD)phase, <br />with staff receiving50% CD drawings and specifications during the week of February 1 for <br />review. <br /> <br />DISCUSSION: <br />Staff has been negotiating a contract with RJM. Due to updated versions of the American <br />Institute of Architects documents since the last project RJM has completed in Elk River, <br />Kennedy & Graven, Charteredand RJM needed to review the bidding process and the A133 <br />contract. The proposed A133 contract for construction management services is attached for <br />commission approval. <br /> <br />Kodet and RJM have put together a project estimate based on previous projects, contractor <br />walkthroughs, and input from subcontractors in the area. Current drawings and the project <br />estimate are attached, staff will receive an updated estimate based off construction documents <br />near the end of February. <br /> <br />The current bond market and construction bids are favorable but costs of both are expected to <br />increase as we move forward. We are currently targeting the end of February to solicit for <br />public bids, with a bid opening near the end of March, and award of bids at the April <br />commission meeting. <br /> <br />FINANCIAL IMPACT: <br />Staff had been planning for a project budget of $12.5 million during budget preparation at the <br />end of last year. Current estimates that include RJM input have the project at approximately <br />______________________________________________________________________________ <br />Page 1 of 2 <br />63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.