Laserfiche WebLink
(09)Survey Monuments. Durable iron survey monuments shall be set, pursuant to Minnesota <br />Statutes, Section 505.02, Subd. 1, within one (1) year after recording of the final plat of the Subdivision. <br />Developer shall provide, in writing, notice to the City a Surveyor’s certification that all monuments <br />have been set. <br />(10)Mailboxes, in a style and location approved by the City of Elk River Post Office, shall be <br />provided prior to occupancy of any unit. <br />5.Additional Regulatory Approvals. All additional regulatory approvals required for <br />construction of the Improvements or development of the Subdivision shall be obtained before <br />commencement of construction on the Improvements. Additional approvals may include but are not <br />limited to the Department of Health permits for water system modifications; Minnesota Pollution <br />Control Agency permits for the extension of sanitary sewer or cluster on-site treatment systems; <br />National Pollutant Discharge Elimination System permits for grading; Department of Natural <br />Resources permits for water appropriations; Army Corps of Engineers permits for construction of <br />sedimentation ponds; and City, County and/or State permits for access and work within existing road <br />rights of ways. <br />6.Installation of Improvements. The Improvements will be installed at Developer’s expense <br />by Developer as hereinafter provided. <br />(01)Developer shall construct and install at Developers sole expense all Improvements necessary <br />to fully complete the Development, including those Improvements identified in Exhibit D, attached <br />hereto, except as may otherwise be set forth in this Agreement. The installation of the Improvements <br />shall be in accordance with all applicable City ordinances, including the City subdivision ordinance, <br />and shall be subject to review, approval, inspection and authorization by the City and/or its specialty <br />consulting staff, as provided in this agreement. <br />(02)Deadline for Performance by Developer. Except as otherwise provided herein, Developer <br />agrees to complete all Improvements and perform all other acts as are required by the Subdivision <br />Ordinance, other applicable ordinances and the terms and conditions of this agreement, and Resolution <br />No.20-86, and to do so on or before October 31, 2021, with the exception of the final wear course of <br />asphalt on streets. The final wear course on streets shall be installed between August 15 and <br />October 15 the year following the base layer of asphalt construction. The Developer may, however, <br />request an extension of time from the City. If an extension is granted, it shall be conditioned upon <br />updating the security posted by the Developer to reflect cost increases and the extended completion <br />date. Final wear course placement outside of this time frame must have the written approval of the <br />City Engineer. <br />(03)Approval of Contractor. The City reserves the right to approve or disapprove any contractor <br />selected by the Developer. <br />(04)Construction Plans. The construction, installation, materials and equipment shall be in <br />accordance with plans and specifications prepared by a licensed professional engineer and approved <br />by the City Engineer. Such plans and specifications shall be based upon such engineering surveys, <br />including soil borings and material tests, determined to be necessary by the City Engineer. <br />(05)Supervision and City Services. Construction and installation plans and activity shall be <br />reviewed by and subject to the supervision of the City. Developer will cause the contractor(s) to inform <br />the City’s representatives of the schedule to complete the Improvements as required in the approvals. <br />City shall inspect all Improvements during and after construction for compliance with approved <br />3 <br />