My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1 SR 03-01-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
03-01-2021
>
7.1 SR 03-01-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2021 10:07:57 AM
Creation date
2/26/2021 9:17:57 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/1/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk Z7-- <br />River <br />13065 Orono Parkway <br />Elk River, hN 55330 <br />January 8, 2021 <br />Patrick Triggs <br />332 Minnesota Street <br />Saint Paul, MN 55101 <br />VIA EMAIL: ptriggs@woldae.com <br />RE: Conditional Use Permit Complete and Comments <br />Dear Mr. Triggs, <br />Thank you for your application for a Conditional Use Permit (CUP) to allow the construction of a <br />Commercial Recreation Facility for an approved Educational Institution located at 75-133-1102, 75- <br />128-4400, 75-128-4106, and 75-134-2100. I will be reviewing your application and preparing the <br />staff report for the Planning Commission and City Council. <br />On December 22, 2020, the city received your application for the above use. Per state statute 15.99, <br />the city is required to make a decision within 60 days of receipt of the completed application. <br />Subdivision 3 of that section requires the city to notify an applicant within 15 business days if <br />information is missing, delaying the start of the 60 day review period. A city may extend the 60 day <br />review period up to 120 days to complete the review. <br />With the receipt of the required materials on December 22, 2020, the application for a CUP has <br />been deemed complete, and the 60-day review period starts. This application has been assigned <br />Case Number CU 21-01 and is scheduled to be reviewed by the Planning Commission on January <br />26, 2021, at 6:30 p.m. at the Elk River City Hall, 13065 Orono Parkway. With a Planning <br />Commission recommendation, the City Council will review your application no earlier than February <br />16, 2021 (Tuesday). <br />Staff conducted a thorough site plan review on January 4, 2021 and has the following comments: <br />Water Department <br />Page 16, keyed note #11 on plans: The minimum size of water service line and <br />corporation when the water service line exceeds 200-feet shall be 1'12.". <br />Phone:763.635.1000 <br />www.ElkRiverMN.gov <br />p 0 W E R 1 0 R1 <br />NATUREI <br />
The URL can be used to link to this page
Your browser does not support the video tag.