Laserfiche WebLink
<br />RESOLUTION 05- <br /> <br />A RESOLUTION FOR THE CITY OF ELK RIVER <br /> <br />A RESOLUTION ACCEPTING BID AND AUTHORIZING <br />EXECUTION OF CONTRACT IN THE MATTER OF THE <br />WWTP HEADWORKS AND SECONDARY DIGESTER COVER IMPROVEMENT OF 2005 <br /> <br />WHEREAS pursuant to a City Council Resolution 05-48, passed at the May 2, 2005 meeting, competitive <br />bids were solicited and received for the WWfP Headworks and Secondary Digester Cover; <br />and <br /> <br />WHEREAS the City Council has considered the amount of the bids and the responsibility of the bidders <br />and determined that Gridor Construction, Inc. is the lowest responsible bidder; <br /> <br />NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: <br /> <br />1. The Mayor and City Administrator are authorized and directed to execute, on behalf of the City, such <br />contract with Gridor Construction, Inc., as is approved by the City Attorney, for the completion of <br />the WWfP Headworks and Secondary Digester Cover according to the approved plans and <br />specifications designed by City Council Resolution. <br /> <br />2. The City Administrator is authorized and directed to forthwith return to all bidders the deposits <br />made with their bids upon execution of the contract specified above. <br /> <br />Passed and adopted this 1st day of August, 2005. <br /> <br />Stephanie A. Klinzing, Mayor <br /> <br />ArrEST: <br /> <br />Joan M. Schmidt, City Clerk <br /> <br />S:\EngineerImprovProj\2005 Improvement Projects \ WWTP Headworks-Digester\Resolu accept bid-authorize contract.doc <br />