Laserfiche WebLink
<br /> Westbound Liquor budget status <br /> Original To-Date <br /> Budget 3/8/2005 Actual <br /> Item Description Amount Bids Cost Variance <br /> General Conditions 92,025 92,025 92,025 <br />Bid <br />Pkg Construction <br /> 1 Earthwork and Site Concrete 115,000 90,072 90,072 (24,928) <br /> 2 Landscaping & Lawn Irrigation 25,000 23,063 23,063 (1,937) <br /> 3 Bituminous paving 45,000 45,584 45,584 584 <br /> 4 Site Utilities 15,000 24,465 24,465 9,465 <br /> 5 Concrete 95,000 100,175 100,175 5,175 <br /> 6 Masonry 205,000 151,146 168,250 (36,750) <br /> 7 Steel Material 65,000 63,000 63,000 (2,000) <br /> 8 Steel Erection 18,000 18,900 18,900 900 <br /> 9 Drywall, Insulation, Stucco & Caulk 100,000 97,300 97,300 (2,700) <br />10 Carpentry, Cabinets, Doors & Misc. 75,000 155,000 134,939 59,939 <br />11 Roofing 75,000 67,371 67,371 (7,629) <br />12 Overhead Door & Dock Equip. 7,200 12,500 6,615 (585) <br />13 Aluminum Entrances & Windows 50,000 49,170 49,170 (830) <br />14 Ceramic Tile 9,000 8,810 8,810 (190) <br />15 Carpet and Resilient Flooring 15,000 9,247 9,247 (5,753) <br />16 Painting & Wall Covering 15,000 16,304 16,304 1,304 <br />17 Exterior Signage 25,000 22,227 17,906 (7,094 ) <br />18 Walk-in Cooler 90,000 101,777 101,777 11 ,777 <br />19 Plumbing & Hydronic Piping 20,000 43,966 23,429 3,429 <br />20 Fire Protection System 25,000 19,900 19,900 (5,100) <br />21 HVAC 45,000 43,300 43,300 (1,700) <br />22 Electric 110,000 103,790 103,790 (6,210) <br /> Subtotal Construction 1,336,225 1,359,092 1,325,391 (10,834) <br /> Construction Contingency 10% 133,623 (133,623) <br /> Alternate # 1: monument sign @ Northbound Liquor 27,007 27,007 <br /> Subtotal Construction Costs 1,469,848 1,352,398 (117,449) <br /> ChanQes to-date: <br /> PR#1 2,356 <br /> PR#2 (7,087) <br /> PR#3 1,513 <br /> PR#4 2,212 <br /> PR#5 4,155 <br /> PR#6 443 <br /> Issues LOQ Items: <br /> Finish Carpentry Alt. # 1: Delete (4) column finishes (6,700) <br /> Delete metal inserts in concrete floor (11,856) <br /> Soil correction at Westbound Liquor monument sign 800 <br /> Mechanical damper change: ESI # 1 750 <br /> Core drill electrical conduit through concrete wall 850 <br /> Add Dens-glass sheathing and plywood @ clearstory walls 2,720 <br /> Subtotal changes I issues to-date: (9,844) <br /> Budget To-Date Totals 1,469,848 1,342,554 (127,294) <br />