Laserfiche WebLink
2021 Elk River High School Stadium Improvements <br />Description of Project Narrative <br />The proposed project is a replacement of the existing Elk River High School stadium, including a <br />synthetic turf field, new track, new visitor and home bleachers, a new ticketing and concessions <br />building, new storage and team room buildings, realignment of existing fields north of the stadium, and <br />resurfacing of a portion of the west elevation of the existing Elk River High School building at the <br />decommissioned dock. The location for the project is the existing stadium site. <br />The new stadium and its support buildings will operate spring, summer, and fall, with the buildings <br />taken out service seasonally in winter. <br />No parking changes are planned as part of this project, which, like the existing stadium, leverages the <br />recently renovated parking lot shared by Elk River High School and the Furniture and Things Community <br />Event Center. <br />Proposed building finish materials are primarily brick and decorative concrete masonry with accents of <br />aluminum rainscreen panel. Roofs will be standing seam metal and asphalt shingle. <br />Signage for the project includes building signage for the new ticketing and concessions building and at <br />the resurfaced wall of the existing High School. Types, locations, and sizes are as shown on the attached <br />drawings. <br />There is an opportunity for some storage under the new bleachers. These areas are fenced, including <br />slats, to limit access to these storage areas while providing visual screening from the surrounding site.