Laserfiche WebLink
STORAGE <br />HOME TEAM <br />A2E5 <br />A2 <br />F5 <br />A2 <br />F5 SIM <br />A2 E5 SIMSTORAGE <br />T.O. GABLE <br />115'-0" <br />MAIN LEVEL <br />100'-0" <br />SPLIT-FACE CONCRETE BLOCK <br />ASPHALT SHINGLE ROOFING <br />OVERHEAD DOOR <br />T.O. GABLE <br />115'-0" <br />MAIN LEVEL <br />100'-0" <br />SPLIT-FACE CONCRETE BLOCK <br />ASPHALT SHINGLE ROOFING <br />A2 <br />F5 SIM <br />A2 <br />F5 SIM <br />A2 E5 SIMA2E5SIMVISITOR TEAM <br />STORAGE <br />EXISTING BRICK <br />MAIN LEVEL <br />100'-0" <br />EXISTING WALL <br />117'-2" <br />ALUMINUM LOGO SIGNAGE, ILLUMINATED FROM BEHIND <br />ALUMINUM RAINSCREEN PANEL <br />NEW WALL SURFACE <br />119'-10" <br />ELK RIVER <br />HIGH SCHOOL <br />FURNITURE <br />AND THINGS <br />COMMUNITY <br />EVENT <br />CENTER <br />A2 F1 <br />MAIN ENTRY <br />F <br />E <br />D <br />C <br />B <br />A <br />1 2 3 4 5 6 7 8 <br />A <br />MN <br />NorthCheck: <br />Drawn: <br />Date: <br />Comm: <br />License Number: <br />I hereby certify that this plan, specification or report was prepared by <br />me or under my direct supervision and that I am a duly Licensed <br />under the laws of the State of <br />Scale: <br />Date <br />12/28/2020 9:05:04 AMC:\Users\ptriggs\Documents\202151 ERHS Stadium Improvements_resave (Central)_ptriggs@woldae.com.rvtAs indicatedCentral: \\Wae-srv-mn.woldae.com\StPaul\ISD728\HS_Elk River\202151 ERHS Stadium\02_ARCH\Revit\202151ERHS Stadium Improvements_resave (Central).rvtIndependent School <br />District #728 <br />2021 Elk River High <br />School Stadium <br />Improvements <br />A2 <br />TEAM/STORAGE <br />BUILDING PLANS <br />AND ELEVATIONS <br />& HIGH SCHOOL <br />DOCK WALL <br />11500 193rd Avenue NW <br />Elk River, MN 55330 <br />900 School Street NW <br />Elk River, MN 55330 <br />NOT FOR CONSTRUCTION <br />CITY SUBMITTAL <br />PT <br />MD <br />12/28/20 <br />202151 <br />MINNESOTA <br />12/28/20 <br />Vaughn Dierks <br />26979 <br />ARCHITECT <br />0 <br />1/8" = 1'-0" <br />WEST TEAM/STORAGE BUILDINGD5 <br />6' 12' <br />0 <br />1/8" = 1'-0" <br />TEAM/STORAGE ELEVATION - EASTE5 <br />6' 12' <br />0 <br />1/8" = 1'-0" <br />TEAM/STORAGE ELEVATION - SOUTHF5 <br />6' 12' <br />Revisions <br />Description Date Num <br />0 <br />1/8" = 1'-0" <br />EAST TEAM/STORAGE BUILDINGD7 <br />6' 12' <br />0 <br />1/8" = 1'-0" <br />HIGH SCHOOL DOCK WALL ELEVATIONF1 <br />6' 12' <br />0 <br />1" = 30'-0" <br />PARTIAL HIGH SCHOOL BUILDING PLANE1 <br />22'-6" 45'