Laserfiche WebLink
Tara Project Number 20.7C <br />Terra <br />Elk River Public Safety Building Expansion <br />j ,v.�;•:i'1 ;;: 1r� City of Elk Riva <br />CONTINUATION SHEET AIADOCUMEMG703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 4 <br />Contractor's signed certification is attached. APPLICATION DATE: 1/1/21 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 1/31/21 <br />A A.1 B C CA C.2 C.3 D E F G H <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK - <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />PRESENTLY <br />COMPLETED <br />(G+C) <br />70 FlNISH <br />FROMPREVIOUS <br />THISPERIOD <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C-G) <br />COST <br />TRANSFER <br />(D+E) <br />(NOTIN <br />TO DATE <br />CODE <br />D OR E) <br />(D+E+F) <br />Klein Electric <br />16-1600 <br />26A <br />00#2 Rough -in for future PD heat <br />$ - <br />$ - <br />$ 2,612.00 <br />$ 2,612.00 <br />$ <br />$ 2,612.00 <br />$ 2,612.00 <br />1D0.00% <br />$ - <br />$ 130.60 <br />Klein Electric <br />16-1600 <br />26A <br />CO#3 COR#27 PD Cabinet Lighting <br />$ - <br />$ - <br />$ 965.00 <br />$ 965.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 965.00 <br />$ - <br />New Look <br />31-1000 <br />31A <br />Mobilization <br />$ 27,400.00 <br />$ - <br />$ - <br />$ 27,400.00 <br />$ 13,700.00 <br />$ 13,700.00 <br />50.00%. <br />$ 13,700.00 <br />$ 685.00 <br />New Look <br />31-1000 <br />31A <br />Locates, Permits, Surveys <br />$ 17,380.00 <br />$ - <br />$ - <br />$ 17,380.00 <br />$ 8,690.D0 <br />$ 8,690.00 <br />50.00% <br />$ 8,690.00 <br />$ 434.50 <br />New Look <br />31-1000 <br />31A <br />Erosion Control <br />$ 4,840.00 <br />$ - <br />$ - <br />$ 4,840.00 <br />$ 4,840.00 <br />$ a,Bao.00 <br />loo.00% <br />$ - <br />$ 242.00 <br />New Look <br />31-1000 <br />31A <br />EC Materials <br />$ 4,000.00 <br />$ - <br />$ - <br />$ 4,01)0.00 <br />$ 4,DD0.00 <br />$ 4,000.00 <br />100.00% <br />$ - <br />$ 200.00 <br />New Look <br />31-1000 <br />31A <br />Removals <br />$ 15,750.00 <br />$ - <br />$ - <br />$ 15,750.D0 <br />$ 7,875.00 <br />$ 7,875.00 <br />50.00% <br />$ 7,875.00 <br />$ 393.75 <br />New Look <br />31-1000 <br />31A <br />Temp Agg Base <br />$ 6,350.00 <br />$ - <br />$ - <br />'$ 6,350.00 <br />$ 1S88.00 <br />$ 4,762.00 <br />$ 6,350.00 <br />100.00% <br />$ - <br />$ 317.50 <br />New Look <br />31.1000 <br />31A <br />Grading <br />$ 15,980.00 <br />$ - <br />$ - <br />$ 15,980.00 <br />$ - <br />$ 15,980.00 <br />$ 35,990,00 <br />100.00% <br />$ - <br />$ 799.00 <br />New Look <br />31-3000 <br />31A <br />Sand Import <br />$ 2,332.00 <br />$ - <br />$ - <br />$ 2,332.00 <br />$ - <br />$ 2,332.00 <br />$ 2,332.00 <br />100.D0% <br />$ - <br />$ 116.60 <br />New Look <br />31-1000 <br />31A <br />Soil Correction <br />$ 17,885.00 <br />$ - <br />$ - <br />$ 17,885.00 <br />$ 17,885.00 <br />$ 17,885.00 <br />100.00% <br />S - <br />$ 894.25 <br />New Look <br />31-1000 <br />31A <br />Structure Exc <br />$ 39,240.DO <br />$ - <br />$ - <br />$ 39,240.00 <br />$ - <br />$ 26,068.00 <br />$ 26,068.00 <br />66.43% <br />5 13,172.00 <br />$ 1,303.40 <br />New Look <br />31-1000 <br />31A <br />Topsoil <br />$ 14,300.00 <br />$ - <br />$ - <br />$ 14,300.00 <br />$ <br />$ - <br />0.00% <br />S 14,300.00 <br />$ - <br />New Look <br />31-1000 <br />31A <br />Fine Grading <br />$ 11,943.00 <br />$ - <br />$ - <br />$ 11,943.00 <br />$ <br />$ - <br />0.00% <br />$ 11,943.0D <br />$ <br />New Look <br />31-1000 <br />31A <br />CO#1 PR#2R Grade Prep <br />$ <br />$ - <br />$ 290.79 <br />$ 290.79 <br />$ - <br />$ <br />0.00% <br />$ 290.79 <br />$ - <br />Fencing (TBD) <br />324000 <br />32A <br />Fencing <br />$ 120,375.00 <br />$ - <br />$ <br />$ 120,375.00 <br />$ - <br />$ - <br />0.00% <br />$ 120,375.D0 <br />$ - <br />Autumn Ridge <br />32-3291 <br />32B <br />Landscaping <br />$ 42,980.00 <br />$ - <br />$ <br />$ 42,980.00 <br />$ - <br />$ - <br />0.00% <br />$ 42,980.00 <br />$ <br />Bituminous Roadways <br />32-IL216 <br />32C <br />Asphalt <br />$ 144,740.00 <br />5 - <br />$ <br />$ 144,740.00 <br />$ - <br />$ - <br />0.00% <br />$ 144,740.00 <br />$ <br />St. Paul Utilities <br />31-3123 <br />33A <br />Water in Labor <br />$ 20,000.00 <br />$ - <br />$ - <br />$ 20,000.00 <br />$ 6,500.00 <br />$ 6,500.00 <br />3250% <br />$ 13500.00 <br />$ 325.00 <br />St. Paul Utilities <br />31-3123 <br />33A <br />Water Main Material <br />$ 10,000.00 <br />$ - <br />$ <br />$ 10,000.00 <br />$ <br />$ - <br />0.00% <br />$ 10,000.00 <br />$ - <br />St. Paul Utilities <br />31-3123 <br />33A <br />Storm Sewer Labor <br />$ 42,000.00 <br />$ - <br />$ - <br />$ 42,0D0.Do <br />$ 6,500.00 <br />$ 6,500.D0 <br />15.48% <br />$ 35,500.00 <br />$ 325.D0 <br />St. Paul Utilities <br />31-3123 <br />33A <br />Storm Sewer Material <br />$ 12,000.00 <br />5 - <br />$ - <br />$ 12,000.DD <br />$ - <br />$ <br />0.00% <br />$ 12,000.00 Is <br />- <br />GRANDTOTALS $ 6,290,219.00 $ - $ (0.00) $ 6,290,219.00 $ 672,512.25 $ 516,002.79 $ - $ 1,188,515.04 18.81$ 5,101,703.96 $ 59,425.75 <br />Page 6 / 6 SPC East Tower - Terre Pay App <br />