Laserfiche WebLink
k <br />Project: City of Elk River Public Safety Bldg Expansion: -ire Station #3 <br />Fluid Interiors <br />.2021 - In Progress <br />FLUID <br />Haworth: Surfaces&Storage <br />(1) Box/Box/Rle <br />-24i92 and 24,09 surface with wleaway supported with wall track/cantilevers (2)field cum- cut surfares to Re room <br />-Surfaces supported by 30H wall track <br />Dispatch . FINISH:Oats Grain. H-DA(HPL Top), Smoke, HPAE(Edgeband), Smoke, TR-E(Palnted Stange), Plaster Smooth, TR-PLS 1 $878.89 $878.89 <br />= (Wall Track) <br />Haworth: Surfaces & Storage <br />(2) BordBox/File <br />-24x86 and 2472 surface with wieaway supported with wall track/antlleven (2)field cuts- cut surfaces to fit room <br />1 - Surfaces supported by 30H wall track Polite Office r FINISH: Oats Grain, H-DA (HPL Top), Smoke, HP-3E(Edgeband), Smoke, TR-E(Painted Storage), Plaster Smooth, TR-PLS 1' $1,279.40 $1,279.40 <br />(Wall Track) <br />Report Wrbing <br />Haworth: Surfaces&Storage <br />(1) Box/Box/File <br />.24n92 and 24x99 surface with wieaway supported with wall track/cantilevers (2)fteld cum -cut surfacesta fit room <br />-Surfaces supported by 30H wall track <br />FINISH: Dam Grain, H-DA (HPL Top), Smoke, HP-3E(Edgehand), Smoke, TR-E(Palnmd Stange), Plaster Smooth, TR-PL5 <br />(Wall Track) <br />1 <br />$702.74 <br />$702.74 <br />Haworth: Surfaces&Storage <br />It) Bax/BoxyFlle <br />- 24x72 and 2454 surface with wleaway supported with wall track/oudlevers (1)field cuts- cut surfaces to fit roam <br />-Surfaces supported by 30H wall track <br />FD Private Office <br />3 <br />$1,258.32 <br />$3,774.96 <br />Desk <br />FINISH: Oats Gain, H-DA (MPL Top), Smoke, HP-3E (Edeeband), Smoke, TR-E (Painted Storage), Plaster Smooth, TR-PLS <br />(WallTack) <br />Mooreca: Markerbuard <br />48"H x 48"W, Markerboard, Porcelain Steel and is magnetic <br />FINISH: Aluminum Trim s. Tap corners are protected with aluminum end caps <br />FD Private Office <br />3 <br />$169.41 <br />$SOB.23 <br />Witeboard <br />FURNITURETOTAL $47p13.94 <br />Estimated Freight & Te1Nfs' <br />$450.00 <br />asubJertro Mwpe bvedonpnai 9vonrnla. <br />FLUID SPECIFICATION, 3D RENDERINGS, INSTALLATION PLANS AND DESIGN <br />$2,S00.00 <br />PHASE 3, FLOOR 1-Fire Station x3 & Outdoor <br />NON -UNION LABOR TO RECEIVE,DELIVER, AND INSTALL BASED ON REGULAR HOURS, ITRIP <br />$7,735.00 <br />•NOTE: Alums, my,mwnp ornmevoi afedneaNfumiNn will be darn by On afOkalver- not RaN bradws. <br />Sales Tax -Tax Exempt <br />$0.00 <br />GRANDTOTALL <br />$60,469.64 <br />TERMS AND CONDITIONS <br />Site Conditions: Installation pricing is based on non -union, single-phase installation during regular business hours (6:00 a.m. -2:00 p.m.), with product shipping to Fluid warehouse. Pricing assumes the space is free and clear, wgh exclusive access to dock <br />freight elevetor(s)- no stair carry. All data, electrical work, and panel to panel connectlons to be completed by others. Any deviations from the terms outlined herein may result in an increase in price. <br />Design: Design ast'mate is based on current scape of Work. Any revisions to scope w111 be billed at $100/hour. <br />Pricing: Pricing Is valid for 30 days. Pricing does not include freight, installation or sales tax. Any unforeseen WIN charges will be subject to a change order and invoiced separately. This document is for budgeting only. Once all product is finalized a formal <br />quote will be issued. A customer setup form, WE, and 50% deposit are required to process orders. <br />Lead Times: Lead times begin after formal quote and purchase order has been processed. Lead time does not include ship time to destination. <br />