My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 02-01-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
02-01-2021
>
8.2. SR 02-01-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2021 11:05:08 AM
Creation date
1/29/2021 10:18:08 AM
Metadata
Fields
Template:
City Government
type
SR
date
2/1/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
711"c',AIA <br />Document A201° - 2017 <br />General Conditions of the Contract for Construction <br />for the following PROJECT: <br />(Name and location or address) <br />20-700 Elk River Public Safety Building Expansion and Fire Station No. 3 <br />ADDITIONS AND DELETIONS: <br />The author of this document has <br />added information needed for its <br />THE OWNER: <br />completion. The author may also <br />have revised the text of the original <br />(Name, legal status and address) <br />AIA standard form. An Additions and <br />Deletions Report that notes added <br />City of Elk River <br />information as well as revisions to the <br />13065 Orono Parkway NW <br />standard form text is available from <br />Elk River, MN 55330 <br />the author and should be reviewed. A <br />vertical line in the left margin of this <br />THE ARCHITECT: <br />document indicates where the author <br />(Name, legal status and address) <br />has added necessary information <br />and where the author has added to or <br />BKV Group <br />deleted from the original AIA text. <br />222 N 2nd St, 4101 <br />MInneapolis, MN 55401 <br />This document has important legal <br />consequences. Consultation with an <br />attorney is encouraged with respect <br />TABLE OF ARTICLES <br />to its completion or modification. <br />1 GENERAL PROVISIONS <br />For guidance in modifying this <br />document to include supplementary <br />2 OWNER <br />conditions, see AIA Document <br />A503TM, Guide for Supplementary <br />3 CONTRACTOR <br />Conditions. <br />4 ARCHITECT <br />5 SUBCONTRACTORS <br />6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS <br />7 CHANGES IN THE WORK <br />8 TIME <br />9 PAYMENTS AND COMPLETION <br />10 PROTECTION OF PERSONS AND PROPERTY <br />11 INSURANCE AND BONDS <br />12 UNCOVERING AND CORRECTION OF WORK <br />13 MISCELLANEOUS PROVISIONS <br />Init. AIA Document A2010-2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The <br />American Institute of Architects. All rights reserved. The "American Institute of Architects," "AIA," the AIA Logo, "A201," and "AIA Contract Documents" are <br />registered trademarks and may not be used without permission. This document was produced by AIA software at 11:53:33 CT on 10/15/2020 under Order <br />No.6421824392 which expires on 04/24/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract <br />Documents° Terms of Service. To report copyright violations, e-mail copyright@aia.org. <br />User Notes: (1263491182) <br />
The URL can be used to link to this page
Your browser does not support the video tag.