Laserfiche WebLink
Tara Project Number 20. <br />Elk River"ic Safety Burl not <br />ANTerra Elk Riry <br />CONTINUATION SHEET AIA DOCUMENT G703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 3 <br />Contractor's signed certiflation is attached. APPLICATION DATE: 12/31/20 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 12/31/20 <br />A <br />A3 <br />B <br />C <br />C.1 <br />C.2 <br />C.3 <br />D E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />FROM PREVIOUS <br />THIS PERIOD <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />PRESENTLY <br />COMPLETED <br />(G. C) <br />TO FINISH <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />ANDSTORED <br />(C-G) <br />COST <br />TRANSFER <br />(D+E) <br />(NOT IN <br />TO DATE <br />CODE <br />GORE) <br />(D+E+F) <br />Summit Fire <br />15-1533 <br />21A <br />Police labor <br />$ 22,500.00 <br />$ - <br />$ <br />$ 22,500.00 <br />$ <br />$ <br />0.00% <br />$ 22,500.00 <br />$ <br />Summit Fire <br />15-1533 <br />21A <br />Police Material <br />$ 12,100.00 <br />$ - <br />$ - <br />$ 12,100.00 <br />$ - <br />$ <br />0.00% <br />$ 12,100.00 <br />$ <br />Summit Fire <br />15-1533 <br />21A <br />Fire Labor <br />$ 11,500.00 <br />$ - <br />$ - <br />$ 11,500.00 <br />$ 11,500.00 <br />S 11,500.00 <br />100.00% <br />$ - <br />$ 575.00 <br />Summit Fire <br />15-1533 <br />21A <br />Fire Material <br />$ 6,200.00 <br />$ - <br />$ - <br />S 6,200.00 <br />$ - <br />$ <br />0.00% <br />$ 6,200.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />Mobilization <br />$ 17,328-00 <br />$ - <br />$ - <br />$ 17,328.00 <br />$ 1,733.00 <br />$ 1,733.00 <br />10.00% <br />$ 15,595.00 <br />$ 86.65 <br />Klein Electric <br />16-1600 <br />26A <br />Permit/Bond <br />$ 4,500.00 <br />$ - <br />$ - <br />$ 4,500.00 <br />$ 4,500.00 <br />$ 4,500.00 <br />100.00% <br />$ - <br />$ 225.00 <br />Klein Electric <br />16-1600 <br />26A <br />Exterior Temp Services/ Job Trailer Temp Power <br />$ 1,500.00 <br />$ - <br />$ - <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 1,500.00 <br />100.00% <br />$ - <br />$ 75.00 <br />Klein Electric <br />16-1600 <br />26A <br />Swhchgear/Panels/Border States Electric <br />$ 4,737.00 <br />$ - <br />$ - <br />$ 4,737.00 <br />$ - <br />$ <br />0.00% <br />$ 4,737.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />Light Fixtures/Controls/Werener Electric Co. <br />$ 109,114.00 <br />$ - <br />$ - <br />$ 109,114.00 <br />$ - <br />$ <br />0.00% <br />$ 10%114.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />Div 28/Fire Alarm/Twenty4Seven <br />S 22,667.00 <br />$ - <br />$ - <br />$ 22,667.00 <br />$ - <br />$ - <br />0.00% <br />$ 22,667.00 <br />5 <br />Klein Electric <br />16.1600 <br />26A <br />FD- Demolition <br />$ 2,197.00 <br />$ - <br />$ - <br />$ 2,197.00 <br />$ 439.00 <br />$ 439.00 <br />19.98% <br />$ 1,758.00 <br />$ 21.95 <br />Klein Electric <br />16-1600 <br />26A <br />FD-Temporary Power/Lights <br />$ 1,146.00 <br />$ - <br />$ - <br />$ 1,146.00 <br />$ <br />$ - <br />0.00% <br />$ 1,146.00 <br />$ <br />K'r;n Electric <br />16-1600 <br />26A <br />FD-Site Underground <br />Material <br />$ 1,060.00 <br />$ - <br />$ - <br />$ 1,060.00 <br />$ <br />$ - <br />0.00% <br />$ 1,060.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD- Site Underground <br />Labor <br />$ 2,980.00 <br />$ - <br />$ - <br />$ 21980.00 <br />$ <br />$ - <br />0.00% <br />$ 2,980.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD - Site Pole Base <br />Material <br />$ 922.00 <br />$ - <br />$ - <br />$ 922.00 <br />$ <br />$ - <br />0.00% <br />$ 922.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD - Site Pole Base <br />Labor <br />$ 817.00 <br />$ - <br />$ - <br />$ 817.00 <br />$ <br />$ - <br />0.00% <br />$ 817.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD -Site Set Parking Lot Poles <br />$ 473A0 <br />$ - <br />$ - <br />$ 473.00 <br />$ <br />$ - <br />0.00% <br />$ 473.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD- Switchgear/Panels Install <br />Labor <br />$ 1,886.00 <br />$ - <br />$ - <br />$ 1,886.00 <br />$ <br />$ - <br />0.00% <br />$ 1,886.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD- Switchgear/Panels Install <br />Material <br />$ 1,127.00 <br />$ - <br />$ - <br />$ 1,127.00 <br />$ <br />$ - <br />0.00% <br />$ 1,127.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD - Ught Fixture Install <br />Labor <br />$ 13,3S3.00 <br />$ - <br />$ - <br />$ 13,351.00 <br />$ - <br />$ - <br />0.00% <br />$ 13,351.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD - Ught Fixture Install <br />Material <br />S 4,298.00 <br />$ - <br />$ - <br />$ 4,298.00 <br />$ <br />$ - <br />0.00% <br />$ 4,298.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD - Light Fixture Control Install <br />Labor <br />$ 2,875.00 <br />$ - <br />$ - <br />$ 2,875.00 <br />$ <br />$ - <br />0.00% <br />$ 2,875.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD - Light Fixture Cantroll Install <br />Material <br />$ 1,012.00 <br />$ - <br />$ - <br />$ 1,012.00 <br />$ <br />$ - <br />0.00% <br />$ 1,012.00 <br />S <br />Klein Electric <br />16-1600 <br />26A <br />FD- Preast Rough-In's <br />Labor <br />$ 4,107.00 <br />$ - <br />$ - <br />$ 4,107.00 <br />$ <br />$ - <br />0.00% <br />$ 4,107.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD- Precast Rough-In's <br />Material <br />$ 1,350.00 <br />$ - <br />$ - <br />$ 1,350.00 <br />$ <br />$ - <br />0.00% <br />$ 1,350.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD- Power/Devices/Receptales <br />Labor <br />$ 16,038.00 <br />$ - <br />$ - <br />$ 16,038.00 <br />$ <br />$ - <br />0.00% <br />$ 16,038.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD- Power/Devices/Receptales <br />Material <br />$ 9,485.00 <br />$ - <br />$ - <br />$ 9,485.00 <br />$ <br />$ <br />0.00% <br />$ 9.485.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD-Unit Heaters <br />Labor <br />$ 1,256.00 <br />$ <br />$ - <br />$ 1,256.00 <br />$ <br />$ <br />0.00% <br />$ 1,256.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD - Unit Heaters <br />Material <br />$ 429.00 <br />$ - <br />$ - <br />$ 429.00 <br />$ <br />$ - <br />0.00% <br />$ 429.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD - Exhaust Fans <br />Labor <br />$ 9S0.00 <br />$ - <br />$ - <br />$ 950.00 <br />$ <br />$ - <br />0.00% <br />$ 950.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD - Exhaust Fans <br />Material <br />$ 463.00 <br />$ - <br />$ - <br />$ 463.00 <br />$ <br />$ - <br />0.00% <br />$ 463.00 <br />S <br />Klein Electric <br />16-1600 <br />26A <br />FD-VAV's <br />Labor <br />$ 816.00 <br />$ - <br />$ - <br />$ 816.00 <br />$ <br />$ - <br />0.00% <br />$ 816.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD -VAV's <br />Material <br />$ 291.00 <br />$ - <br />$ - <br />$ 291.00 <br />$ <br />$ - <br />0.00% <br />$ 291.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD - Boilers <br />Labor <br />$ 339.00 <br />$ - <br />$ - <br />$ 339.00 <br />$ <br />$ - <br />0.00% <br />$ 339.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD - Boilers <br />Material <br />$ 196.00 <br />$ - <br />$ - <br />$ 196.00 <br />$ <br />$ - <br />0.00% <br />$ 196.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD - Pumps <br />Labor <br />$ 2,096.00 <br />S - <br />$ - <br />S 2,096.00 <br />$ <br />S - <br />0.00% <br />$ 2,096.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD - Pumps <br />Material <br />$ 754.00 <br />$ - <br />$ - <br />$ 754.00 <br />$ <br />$ - <br />0.00% <br />$ 754.00 <br />$ - <br />Klein Electric <br />16.1600 <br />26A <br />FD- MAU <br />Labor <br />$ 797.00 <br />$ - <br />$ - <br />$ 797.00 <br />$ <br />$ - <br />0.00% <br />$ 797.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />FD - MAU <br />Material <br />$ 219.00 <br />$ - <br />$ - <br />$ 219.00 <br />$ <br />$ - <br />0.00% <br />$ 219.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD-CU <br />Labor <br />$ 1,074.00 <br />$ - <br />$ - <br />$ 1,074.00 <br />$ <br />$ <br />0.0C% <br />$ 1,074.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD-CU <br />Material <br />$ 764.00 <br />$ - <br />$ - <br />$ 764.00 <br />$ <br />$ - <br />0.00% <br />$ 764.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD-AHU <br />Labor <br />$ 618.00 <br />$ - <br />$ - <br />$ 618.00 <br />$ <br />$ - <br />0.00% <br />$ 618.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />FD-AHU <br />Material <br />$ 174.00 <br />$ - <br />$ <br />$ 174.00 <br />$ <br />$ - <br />0 <br />$ 174.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD-Steam Generator <br />Labor <br />$ 1,108.00 <br />$ - <br />$ <br />$ 1,108.00 <br />$ <br />$ <br />0Z.N <br />$ 1, LBB.00 <br />$ <br />Klein Electric <br />16-1600 <br />26A <br />FD - Steam Generator <br />Material <br />$ 669.00 <br />S - <br />$ <br />$ 669.00 <br />$ - <br />$ - <br />0.00% <br />$ 669.00 <br />$ - <br />Page 4 / 6 SPC East Tower - Tena Pay App <br />