Laserfiche WebLink
Terra Project Numbs <br />Terra an ion <br />Elk River Public ity Building oof <br />OONBTNt10Tlt Elk Rive <br />CONTINUATION SHEET AIA DOCUMENT G703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 3 <br />Contractor's signed certification is attached. APPLICATION DATE: 12/31/20 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 12/31/20 <br />A <br />A.1 <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORKCOMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />FROMPREVIOUS <br />THISPERIOD <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />PRESENTLY <br />COMPLETED <br />(G+C) <br />TO FINISH <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C-G) <br />COST <br />TRANSFER <br />(D+E) <br />(NOTIN <br />TO DATE <br />CODE <br />D OR E) <br />' D+E+FI <br />Ben's Structural Fab <br />05-5120 <br />SA <br />Steel Supplier -Joist <br />$ 53,937.50 <br />$ - <br />$ - <br />$ 53,937.50 <br />$ <br />$ - <br />0.00% <br />$ 53,937.50 <br />$ <br />Ben's Structural Fab <br />05-5120 <br />5A <br />Steel Supplier -Deck <br />$ 23,732.50 <br />$ - <br />$ - <br />$ 23,732.50 <br />$ <br />$ - <br />0.00% <br />$ 23,732.50 <br />$ <br />Ben's Structural Fab <br />05-5120 <br />SA <br />Steel Supplier -Metal Fabrication <br />$ 26,118.12 <br />$ - <br />$ - <br />$ 26,118.12 <br />$ <br />$ - <br />0.00% <br />$ 26,118.12 <br />$ - <br />Patriot Erectors <br />05-5121 <br />5B <br />PD- Structural Steel <br />Labor <br />$ 8,362.00 <br />$ - <br />$ - <br />$ 8,362.00 <br />$ <br />$ - <br />0.00% <br />$ 8,352.00 <br />5 <br />Patriot Erectors <br />05-5121 <br />5B <br />PD - Steel Joist <br />Labor <br />$ 5,500.00 <br />$ - <br />$ - <br />$ 6,500.00 <br />$ <br />$ - <br />0.00% <br />$ 6,500.00 <br />$ <br />Patriot Erectors <br />05-5121 <br />5B <br />PD - Steel Roof Deck <br />Labor <br />$ 7,500.00 <br />$ - <br />$ - <br />$ 7,500.00 <br />$ <br />$ - <br />0.00% <br />$ 7,500.00 <br />$ <br />Patriot Erectors <br />05-5121 <br />5B <br />PD-Metal Fab <br />Labor <br />$ 4,500.00 <br />$ - <br />$ - <br />$ 4,500.00 <br />$ <br />$ - <br />0.00% <br />$ 4,500.00 <br />$ <br />Patriot Erectors <br />05-5121 <br />5B <br />PD - Metal Stairs <br />Labor <br />$ - <br />$ - <br />$ - <br />$ - <br />$ <br />$ - <br />#DIV/01 <br />$ - <br />$ <br />Patriot Erectors <br />05-5121 <br />SB <br />PD- Pipe&Tube Railings <br />Labor <br />$ - <br />$ - <br />$ - <br />$ - <br />$ <br />$ - <br />#DIV/01 <br />$ <br />$ <br />Patriot Erectors <br />05.5121 <br />5B <br />FD- Structural Steel <br />Labor <br />$ 2,780.00 <br />$ - <br />$ - <br />$ 2,780.00 <br />$ <br />$ - <br />0.00% <br />$ 2,780.00 <br />$ <br />Patriot Erectors <br />05-5121 <br />5B <br />FD - Steel Joist <br />Labor <br />$ 2,000.00 <br />$ <br />$ - <br />$ 2,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,000.00 <br />$ <br />Patriot Erectors <br />05-5121 <br />5B <br />FD-Steel Roof Deck <br />Labor <br />$ 4,000.00 <br />$ - <br />$ - <br />$ 4,000.00 <br />$ <br />$ - <br />0.00% <br />$ 4,000.00 <br />$ - <br />PatriotErectors <br />05-5121 <br />5B <br />FD-Metal Fab <br />Labor <br />$ 1,750.00 <br />$ - <br />$ - <br />$ 1,750.00 <br />$ <br />$ - <br />0.00% <br />$ 1,750.00 <br />$ <br />Patriot Erectors <br />05-5121 <br />5B <br />FD-Metal Stairs <br />Labor <br />$ 1,600.00 <br />$ <br />$ - <br />$ 1,600.00 <br />$ <br />$ <br />0.00% <br />$ 11600.00 <br />$ <br />Patriot Erector; <br />05.5121 <br />5B <br />FD- Pipe&Tube Railings <br />Labor <br />$ 1,500.00 <br />$ - <br />$ - <br />$ 1,500.00 <br />$ <br />$ <br />0.00% <br />$ 1,500.00 <br />$ <br />Patriot Erectors <br />05-5121 <br />5B <br />Bond <br />$ 558.00 <br />S - <br />$ - <br />$ 658.00 <br />$ <br />$ - <br />0.00% <br />$ 658.00 <br />$ <br />Century Construction <br />06-6100 <br />6A <br />Area A FD Addition Envelop <br />$ 11,000.00 <br />$ <br />$ - <br />$ 11,000.00 <br />$ 3,000.00 <br />$ 2,500.00 <br />$ 5,500.00 <br />50.00% <br />$ 5,500.00 <br />$ 275.00 <br />Century Construction <br />06-6100 <br />6A <br />Area A FD Addition Interior <br />$ 10,200.00 <br />S - <br />$ - <br />$ 10,200.00 <br />$ <br />$ - <br />0.00% <br />$ 10,200.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Area A FD Renovation <br />$ 17,000.00 <br />$ - <br />$ - <br />$ 17,000.00 <br />$ <br />$ <br />D.00% <br />$ 17,000.00 <br />$ <br />Century Construction <br />06-6100 <br />6A <br />Area C PD Addition Envelope <br />$ 18,000.00 <br />$ <br />$ - <br />$ 18,000.00 <br />$ <br />$ - <br />0.00% <br />$ 18,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Area C PD Addition Interior <br />$ 3,000.00 <br />$ <br />$ - <br />$ 3,000.00 <br />$ <br />$ - <br />0.00% <br />$ 3,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Area C PD Renovation <br />$ 10,300.00 <br />$ - <br />$ - <br />$ 10,300.00 <br />$ <br />$ - <br />0.00% <br />$ 10,300.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Area B PD Phase 1 <br />$ 15,000.00 <br />$ <br />$ - <br />$ 15,000.00 <br />$ <br />$ <br />D.00% <br />$ 15,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Area B PD Phase 2 <br />$ 14,000.00 <br />$ - <br />$ - <br />$ 14,000.00 <br />$ <br />$ - <br />0.00% <br />$ 14,000.00 <br />$ <br />Century Construction <br />06-6100 <br />6A <br />Alternate #1-U. Area B <br />$ 2,000.00 <br />$ <br />$ - <br />$ 2,000.00 <br />$ <br />$ - <br />D.00% <br />$ 2,000.00 <br />$ - <br />Century Construction <br />06.6100 <br />6A <br />Performance and Payment Bond <br />$ 4,500.00 <br />$ - <br />$ - <br />$ 4,500.00 <br />$ 4,500.00 <br />$ 4,500.00 <br />100.00% <br />$ - <br />$ 225.00 <br />CenturyConstruction <br />06-6100 <br />6A <br />Allowance <br />$ 10,000.00 <br />$ - <br />$ - <br />$ 10,000.00 <br />$ <br />$ - <br />0.00% <br />$ 10,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Area A Materials <br />$ 12,500.00 <br />$ - <br />$ - <br />$ 12,500.00 <br />$ 3,000.00 <br />$ 2,000.00 <br />$ 5,000.00 <br />40.00% <br />$ 7,500.00 <br />$ 250.00 <br />Century Construction <br />06-6100 <br />6A <br />Area B Materials <br />$ 14,000.00 <br />$ <br />$ - <br />$ 14,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 14,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Area C Materials <br />$ 12,500.00 <br />$ - <br />$ - <br />$ 12,500.00 <br />$ - <br />$ - <br />0.00% <br />$ 12,500.00 <br />$ - <br />Ron's Cabinets <br />06-6200 <br />5B <br />Casework <br />$ 83,750.00 <br />$ <br />$ - <br />$ 83,750.00 <br />$ - <br />$ <br />0.00% <br />$ 83,750.00 <br />$ - <br />Structural Applicators <br />07-7210 <br />7C <br />Fluid Applied Air Barriers <br />$ 14,696.00 <br />$ <br />$ - <br />$ 14,696.00 <br />$ - <br />$ - <br />0.00% <br />$ 14,696.00 <br />$ - <br />John A Dalsin <br />07-7510 <br />7A <br />Roofng <br />$ 236,246.00 <br />$ - <br />$ <br />$ 236,246.00 <br />$ - <br />$ - <br />0.00% <br />$ 236,246.00 <br />$ - <br />Lake Area Roofing <br />07-7412 <br />78 <br />Metal Wall Panels <br />$ 17,881.00 <br />$ - <br />$ - <br />$ 17,881.00 <br />$ - <br />$ - <br />0.00% <br />$ 17,881.00 <br />$ - <br />Waumadee Creek <br />07-7900 <br />7D <br />Sealants <br />$ 39,684.00 <br />$ - <br />$ - <br />$ 39,684.00 <br />$ - <br />$ - <br />0.00% <br />$ 39,684.00 <br />$ - <br />Mid -Central Door <br />08-8200 <br />8A <br />Hardware Material <br />$ 36,623.00 <br />$ <br />$ - <br />$ 36,623.00 <br />$ - <br />$ <br />0.00% <br />$ 36,623.00 <br />$ - <br />Mid -Central Door <br />CM200 <br />BA <br />HM Door Material <br />$ 11,098.00 <br />$ - <br />$ - <br />$ 11,098.00 <br />$ - <br />$ <br />0.00% <br />$ 11,098.00 <br />$ - <br />Mid-Centmi Door <br />08-8200 <br />SA <br />HM Frame Material <br />$ 22,122.00 <br />$ - <br />$ - <br />$ 22,122.00 <br />$ - <br />$ 11,697.32 <br />$ 11,697.32 <br />52.88% <br />$ 10,'24.68 <br />$ 584.87 <br />Mid -Central Door <br />08-8200 <br />8A <br />Specialty Material <br />$ 3,541.00 <br />$ - <br />$ - <br />$ 3,541.00 <br />$ - <br />$ - <br />0.00% <br />$ 3,541.00 <br />$ - <br />Page 216 SPC East Tower - Terra Pay App <br />