Laserfiche WebLink
Project Number <br />Terra Elk River Public Safety Buildng Expansion <br />CONSTNUCTION aly Of Elk Rver <br />CONTINUATION SHEET AIA DOCUMENT G703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 3 <br />Contractor's signed certification is attached. APPLICATION DATE: 12/31/20 <br />In tabulations below, amounts are stated to the nearest dollar. PERIODTO: 12/31/20 <br />A <br />A.1 <br />B <br />C <br />C.1 <br />C.2 <br />C.3 <br />D <br />E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />REM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />FROM PREVIOUS <br />THIS PERIOD <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />PRESENTLY <br />COMPLETED <br />(G. C) <br />TO FINISH <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />COST <br />TRANSFER <br />(D+E) <br />(NOTIN <br />TO DATE <br />CODE <br />D OR E) <br />(D+E+F) <br />New Look <br />31-1000 <br />31A <br />Mobilization <br />$ 27,400.00 <br />$ - <br />$ - <br />$ 27,400,00 <br />$ 13,700.00 <br />$ 13,700.00 <br />50.00% <br />$ 13,700.00 <br />$ 685.00 <br />New Look <br />31-1000 <br />31A <br />Locates, Permits, Surveys <br />$ 17,380.00 <br />$ <br />$ - <br />$ 17,380.00 <br />$ 8,690.00 <br />$ 8,690.00 <br />50.00% <br />$ 8,690.00 <br />$ 434.50 <br />New Look <br />31-1000 <br />31A <br />Erosion Control <br />$ 4,840.00 <br />$ <br />$ - <br />$ 4,840.00 <br />$ 4,840.00 <br />$ 4,840.00 <br />100.00% <br />$ - <br />$ 242.00 <br />New Look <br />31-1000 <br />31A <br />EC Materials <br />$ 4,000.00 <br />$ <br />$ - <br />$ 4,000.00 <br />$ 4,000.00 <br />$ 4,000.00 <br />100.00% <br />$ - <br />$ 200.00 <br />New Look <br />31-1000 <br />31A <br />Removals <br />$ 15,750.00 <br />$ <br />$ - <br />$ 15,750.00 <br />$ 7,875.00 <br />$ 7,875.00 <br />50.00% <br />$ 7,875.00 <br />$ 393.75 <br />New Look <br />31-1000 <br />31A <br />Temp Agg Base <br />$ 6,350.00 <br />$ <br />$ - <br />$ 6,350.00 <br />$ 1,598.00 <br />$ 1,588.00 <br />25.01% <br />$ 4,762.00 <br />$ 79.40 <br />New Look <br />31-1000 <br />31A <br />Grading <br />$ 15,980.00 <br />$ <br />$ - <br />$ 15,980.00 <br />$ <br />$ <br />0.00% <br />$ 15,980.00 <br />$ <br />New Look <br />31-1000 <br />31A <br />Sand Import <br />$ 2,332.00 <br />$ <br />$ - <br />$ 2,332.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,332.00 <br />$ <br />New Look <br />31-1000 <br />33A <br />Soil Correction <br />$ 17,885.00 <br />$ <br />$ - <br />$ 17,885.00 <br />$ 17,885.00 <br />$ 17,885.00 <br />100.00% <br />$ - <br />$ 894.25 <br />New Look <br />31-1000 <br />31A <br />Structure Exc <br />$ 39,240.00 <br />$ <br />$ - <br />$ 39,240.00 <br />$ - <br />$ - <br />0.00% <br />$ 39,240.00 <br />$ - <br />New Look <br />31-1000 <br />31A <br />Topsoil <br />$ 14,300.00 <br />$ <br />$ - <br />$ 14,300.00 <br />$ - <br />$ - <br />0.00% <br />$ 14,300.00 <br />$ <br />New Look <br />31-1000 <br />31A <br />Fine Grading <br />$ 11,943.00 <br />$ <br />$ - <br />$ 11,943.00 <br />$ - <br />$ - <br />0.00% <br />$ 11,943.00 <br />$ - <br />Fencing (TBD) <br />32-4000 <br />32A <br />Fencing <br />$ 120,375.00 <br />$ <br />$ - <br />$ 120,375.00 <br />$ - <br />S - <br />0.00% <br />$ 120.375.00 <br />$ - <br />Autumn Ridge <br />32-3291 <br />32B <br />Landscaping <br />$ 42,980.00 <br />$ <br />$ - <br />$ 42,990.00 <br />$ <br />$ <br />0.00% <br />$ 42,980.00 <br />$ <br />Bituminous Roadways <br />32-1216 <br />32C <br />Asphalt <br />$ 144,740.00 <br />$ <br />$ - <br />$ 144,740.00 <br />$ - <br />$ - <br />0.00% <br />$ 144,740.00 <br />$ <br />St. Paul Utilities <br />31-3123 <br />33A <br />Water Main Labor <br />$ 20,000.00 <br />$ <br />$ - <br />$ 20,000.00 <br />$ 6,500.00 <br />$ 6,500.00 <br />32.50% <br />$ 13,500.00 <br />$ 325.00 <br />St. Paul Utilities <br />31-3123 <br />33A <br />Water Main Material <br />$ 50,000.00 <br />$ - <br />$ - <br />$ 10,000.00 <br />$ - <br />$ <br />0.00% <br />$ 10,000.00 <br />$ - <br />St. Paul Utilities <br />31-3123 <br />33A <br />Storm Sewer Labor <br />$ 42,000.00 <br />$ - <br />$ - <br />5 42,000.00 <br />$ 6,500.00 <br />$ 6,500.00 <br />15.48% <br />$ 35,500.00 <br />$ 325.00 <br />St. Paul Utilities <br />31-3123 <br />33A <br />Storm Sewer Material <br />$ 12,000.00 <br />$ - <br />$ - <br />$ 12,000.00 <br />$ <br />$ <br />0.00% <br />$ 12,000.00 <br />$ - <br />GRANDTOTALS $ 6,290,219.00 $ - $ - $ 6,290,219.00 $ 411,987.47 $ 260,524.78 $ - $ 672,512.25 10.69% $ 5,617,706.75 $ 33,625.61 <br />Page 616 SPC East Tower - Terra Pay App <br />