Laserfiche WebLink
<br /> <br />October 8, 2020 <br /> <br />Jake Walz <br />Seth Calvin <br />Brandon Wisner <br />City of Elk River <br /> <br />Re: Budget proposal for low voltage cabling at the Public Safety Building Police Dept area <br /> <br />Material price $15,452.49 <br />Labor price $17,094.38 <br />Lift Rental $ 900.00 <br />Total price $33,446.87 <br /> <br />Scope of work includes: <br /> Install 1 cat 6 plenum rated cable to each of the 5 new WAP locations <br /> Install 1 cat 6 plenum rated cable to each of the 5 new camera location <br /> Install 2 cat 6 plenum rated cables to each of the 6 dual locations <br /> Install 4 cat 6 plenum rated cables to each of the 27 quad locations <br />o Quad locations will receive 1 green cable and 3 blue cables <br /> Install 6 cat 6 plenum rated cables to a location in the far end of the squad bay <br />o This location will receive 1 green cable and 5 blue cables <br /> Install of 1 cat 6 and 1 RG6 coax cable to the 8 television locations <br /> Terminate cables with a jack and biscuit box at all WAP and camera locations <br /> Terminate wall locations with jacks and faceplates <br /> Install a 2’ wall mount swing rack in the radio room <br /> Install 12” ladder rack and associated mounting hardware for cable pathways in the radio <br />room closet <br /> Install 6 strand single mode fiber between the radio room closet and the main closet in the <br />building <br /> Install a new rack mount fiber panel on each end <br /> Terminate fiber with LC connectors <br /> Terminate cables on new patch panels in the data closets <br /> Testing of new cabling included <br /> Patch cords and installation of them is not included <br /> <br />If you have any further questions on this pricing let me know, <br /> <br />Pete Helmin <br />All State Communications <br />320-333-8130 <br /> 5114 Marson Drive  Sauk Rapids, MN 56379 <br />Business (320) 203-1511  Fax (320) 203-1510 <br />