My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1 SR 12-21-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
12-21-2020
>
8.1 SR 12-21-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 3:56:39 PM
Creation date
12/18/2020 9:08:48 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/21/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OVERALL REMOVALS/EXISTING CONDITIONS PLAN <br />T. WOLD <br />02013673-A <br />J. FILLMORE <br />K. GRIESHABER <br />CITY OF ELK RIVER <br />BYCHKDAPPR <br />SHEET <br />42164 <br />GENERAL SITE IMPROVEMENTS <br />12/17/2020 <br />L1.0 <br />ORONO PARK <br />DATE <br />I hereby certify that this plan,specification, or report was preparedand that I am a duly Licensedthe State of Minnesota. <br />by me or under my direct supervisionLandscape Architect under the laws ofREVISIONSNO. <br />CHECKED BYCOMM. NO. <br />PRINT NAME:SIGNATURE:DATE:LICENSE #:DRAWN BYDESIGNED BY <br />EXISTING CONTOURCLEAR AND GRUB TREE (EACH)CLEAR AND GRUBREMOVE BITUMINOUSREMOVE CONCRETEREMOVE SAND/AGGREGATEREMOVE CONCRETE CURBREMOVE CHAIN LINK FENCESILT FENCECONSTRUCTION LIMITS <br /> <br />LEGEND <br />: <br />AND AS REQUIRED TO CONSTRUCT THE PROPOSEDACCESS DRIVE AND RESTORE ALL AREAS DISTURBED BY <br />CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT651-454-0002 FOR FIELD LOCATION OF UNDERGROUND UTILITIES.NECESSARY TRAFFIC CONTROL DEVICES TO THE SATISFACTIONOF THE OWNER.MEASURES AS <br /> SHOWN ON THE PLANS AND AS REQUIRED TOPREVENT SILT MIGRATION PRIOR TO BEGINNING CONSTRUCTION.THESE MEASURES SHALL INCLUDE INLET PROTECTION AT ALLSTORMWATER INLETS RECEIVING RUN OFF FROM <br /> THE PROJECTSITE.50' LONG ROCK ACCESS DRIVE FOR THE DURATION OFCONSTRUCTION. THE CONTRACTOR SHALL REMOVE THECONSTRUCTION ACTIVITIES AND ACCESS UPON COMPLETION OFCONSTRUCTION.(NON-WLEDED) <br /> EROSION CONTROL BLANKET ON ALL SLOPES 3:1OR STEEPER.PARKING VEHICLES OR EQUIPMENT UNDER DRIP LINES OFTREES.OR OUTERMOST BRANCHES. FENCE TO ENCIRCLE TREE WITHINCONSTRUCTION LIMITS. <br /> THE OWNER WILL IDENTIFY TREEPROTECTION FENCING LOCATIONS.TO GRADING OPERATIONS. <br />IMPROVEMENTS. VERIFY LIMITS WITH OWNER.HEIGHT WITH POSTS 8' O.C. WITH 2' MIN. BURY AT THE DRIPLINE <br />2.CONTRACTOR SHALL FURNISH, INSTALL, AND MAINTAIN ALL3.CLEAR AND GRUB VEGETATION WITHIN CONSTRUCTION LIMITS2.THE CONTRACTOR SHALL PROVIDE AND MAINTAIN A 30' WIDE X3.THE CONTRACTOR SHALL <br /> INSTALL AND MAINTAIN CATEGORY 3N TREE PROTECTION NOTES:2.TREE PROTECTION TO BE SNOW OR CONSTRUCTION FENCE OF 4'3.TREE PROTECTION FENCING SHALL BE CONSIDERED INCIDENTAL <br />GENERAL NOTES:1.STATE LAW: 48 HOURS BEFORE EXCAVATION BEGINS EROSION CONTROL NOTES:1.THE CONTRACTOR SHALL INSTALL EROSION CONTROL1.PROTECT ALL TREES IN IMMEDIATE VICINITY OF WORK. <br /> NO <br />DI <br />DI <br />DI <br />DI <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.