Laserfiche WebLink
OVERALL LANDSCAPE PLAN <br />T. WOLD <br />02013673-A <br />J. FILLMORE <br />K. GRIESHABER <br />CITY OF ELK RIVER <br />BYCHKDAPPR <br />SHEET <br />42164 <br />GENERAL SITE IMPROVEMENTS <br />12/17/2020 <br />L4.0 <br />ORONO PARK <br />DATE <br />I hereby certify that this plan,specification, or report was preparedand that I am a duly Licensedthe State of Minnesota. <br />by me or under my direct supervisionLandscape Architect under the laws ofREVISIONSNO. <br />CHECKED BYCOMM. NO. <br />PRINT NAME:SIGNATURE:DATE:LICENSE #:DRAWN BYDESIGNED BY <br />CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT651-454-0002 FOR FIELD LOCATION OF UNDERGROUND UTILITIES.OF THE OWNER.AND AS REQUIRED TO CONSTRUCT THE PROPOSEDTHESE MEASURES SHALL INCLUDE <br /> INLET PROTECTION AT ALLSTORMWATER INLETS RECEIVING RUN OFF FROM THE PROJECTSITE.50' LONG ROCK ACCESS DRIVE FOR THE DURATION OFCONSTRUCTION. THE CONTRACTOR SHALL REMOVE THEACCESS DRIVE <br /> AND RESTORE ALL AREAS DISTURBED BYCONSTRUCTION ACTIVITIES AND ACCESS UPON COMPLETION OFCONSTRUCTION.OR STEEPER.TREES.OR OUTERMOST BRANCHES. FENCE TO ENCIRCLE TREE WITHINCONSTRUCTION <br /> LIMITS. THE OWNER WILL IDENTIFY TREETO GRADING OPERATIONS. <br />NECESSARY TRAFFIC CONTROL DEVICES TO THE SATISFACTIONIMPROVEMENTS. VERIFY LIMITS WITH OWNER.MEASURES AS SHOWN ON THE PLANS AND AS REQUIRED TOPREVENT SILT MIGRATION PRIOR TO BEGINNING <br /> CONSTRUCTION.(NON-WLEDED) EROSION CONTROL BLANKET ON ALL SLOPES 3:1PARKING VEHICLES OR EQUIPMENT UNDER DRIP LINES OFHEIGHT WITH POSTS 8' O.C. WITH 2' MIN. BURY AT THE DRIPLINEPROTECTION <br /> FENCING LOCATIONS. <br />GENERAL NOTES:2.CONTRACTOR SHALL FURNISH, INSTALL, AND MAINTAIN ALL3.CLEAR AND GRUB VEGETATION WITHIN CONSTRUCTION LIMITS2.THE CONTRACTOR SHALL PROVIDE AND MAINTAIN A 30' WIDE X3.THE <br /> CONTRACTOR SHALL INSTALL AND MAINTAIN CATEGORY 3N TREE PROTECTION NOTES:2.TREE PROTECTION TO BE SNOW OR CONSTRUCTION FENCE OF 4'3.TREE PROTECTION FENCING SHALL BE CONSIDERED INCIDENTAL <br /> <br />1.STATE LAW: 48 HOURS BEFORE EXCAVATION BEGINS EROSION CONTROL NOTES:1.THE CONTRACTOR SHALL INSTALL EROSION CONTROL1.PROTECT ALL TREES IN IMMEDIATE VICINITY OF WORK. NO <br />PLANT SCHEDULE <br />AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OFANY WORK. <br />OF THE MNDOT SPEC BOOK AND THE SPECIAL PROVISIONS. <br />REQUIREMENTS. <br />5.CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT <br />10.REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL11.CONSTRUCTION SHALL BE GOVERNED BY THE 2018 EDITION IRRIGATION NOTES:1.SEE SPECIAL PROVISIONS FOR REQUIREMENTS. <br />SITE AMENITIES, ETC.STATE LAW PRIOR TO ANY WORK COMMENCING.CONSTRUCTION AND LANDSCAPING. <br />MARKING OF ALL UNDERGROUND UTILITIES ACCORDING TOIRRIGATION SYSTEMS THAT ARE DAMAGED DURINGLANDSCAPE ARCHITECT FOR DIRECTION PRIOR TOPROCEEDING. <br />TURF ESTABLISHMENT NOTES:2.CONTRACTOR SHALL COORDINATE LOCATION AND3.CONTRACTOR SHALL REPAIR AND RESTORE ANY EXISTING4.REPORT ALL LAYOUT DISCREPANCIES IMMEDIATELY TO THE <br />1.PROTECT ALL EXISTING STRUCTURES, UTILITIES, TREES, <br />SHRUBTURF SEED MIXSTORMWATER SEED MIXSILT FENCE <br />LEGEND DECIDUOUS TREEUNDERSTORY TREEEXISTING TREESIRRIGATION LIMITSCONSTRUCTION LIMITS <br /> <br />