My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.7 SR 12-21-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
12-21-2020
>
4.7 SR 12-21-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 3:56:06 PM
Creation date
12/18/2020 9:03:29 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/21/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MnDOT Contract No.: 1044570 <br />7.Agreement No. 1045391 between the State and Elk River Municipal Utilities will address watermain <br />construction; and <br />8.Minnesota Statutes § 161.45, subdivision 2, allows for City-owned utility relocation to be included in a State <br />construction contract, and payment by the City for such relocation according to applicable statutes and rules <br />for utilities on trunk highways; and <br />9.Minnesota Statutes § 161.20, subdivision 2 authorizes the Commissioner of Transportation to make <br />arrangements with and cooperate with any governmental authority for the purposes of constructing, <br />maintaining, and improving the trunk highway system. <br />Agreement <br />1.Term of Agreement; Survival of Terms; Plans; Incorporation of Exhibits <br />1.1.Effective Date. This Agreement will be effective on the date the State obtains all signatures required by <br />Minnesota Statutes § 16C.05, subdivision 2. <br />1.2.Expiration Date. This Agreement will expire when all obligations have been satisfactorily fulfilled. <br />1.3.Survival of Terms. All clauses which impose obligations continuing in their nature and which must survive <br />in order to give effect to their meaning will survive the expiration or termination of this Agreement, <br />including, without limitation, the following clauses: 3. Maintenance by the City; 11. Liability; Worker <br />Compensation Claims; 14. State Audits; 15. Government Data Practices; 17. Governing Law; Jurisdiction; <br />Venue; and 19. Force Majeure. The terms and conditions set forth in Article 4. Signal Systems and <br />Emergency Vehicle Preemption Systems Operation and Maintenance will survive the expiration of this <br />Agreement, but may be terminated by another Agreement between the parties. <br />1.4.Plans, Specifications, and Special Provisions. Plans, specifications, and special provisions designated by <br />the State as State Project No. 7102-135 (T.H. 10=003) are on file in the office of the Commissioner of <br />Transportation at St. Paul, Minnesota, and incorporated into this Agreement by reference ("Project <br />Plans"). <br />1.5.Exhibits. Preliminary Schedule "I" is on file in the office of the City's Public Works Director/Chief Engineer <br />and the County's Public Works Director/County Engineer and is attached and incorporated into this <br />Agreement. <br />2.Construction by the State <br />2.1.Contract Award. The State will advertise for bids and award a construction contract to the lowest <br />responsible bidder according to the Project Plans. <br />2.2.Direction, Supervision, and Inspection of Construction. <br />A.Supervision and Inspection by the State. The State will direct and supervise all construction activities <br />performed under the construction contract, and except as provided below, perform all construction <br />engineering and inspection functions in connection with the contract construction. All contract <br />construction will be performed according to the Project Plans. <br />B.Construction Engineering and Inspection by the City. The City will assign its City Engineer or other <br />registered professional engineer to perform construction engineering in connection with the sanitary <br />sewer and lighting construction. The engineer so assigned will act under the supervision and direction <br />of the State and be responsible for construction inspection, control of materials, and associated <br />documentation for said construction. The construction will be performed according to the Project Plans <br />and recognized and accepted practices and procedures as set forth in various State manuals, including <br />-2- <br />Receivable Standard CE by Both Parties (Cooperative Agreements) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.