Laserfiche WebLink
16,090.9019,393.37 <br />241,806.00241,806.00294,042.66294,042.66124,586.75101,739.50 <br />$242,417.15$261,810.52 <br />80 Percent <br />Federal Aid <br />Preliminary: December 1, 2020 <br />60,451.5060,451.5073,510.6773,510.67 <br />20 Percent <br />Federal Aid Match <br />0.000.00 <br />9,818.25 <br />47,157.5047,157.5017,470.7516,090.9049,583.10 <br />124,586.75101,739.50252,235.40 <br />No Federal Aid <br />6,095.256,331.50 <br />$17,470.75$49,583.10 <br />$349,415.00$619,788.73$512,835.67 <br />TOTALS <br />($535,848.66) <br />$1,036,257.58$1,048,684.33 <br />- 1 - <br />Agreement No. 1044570 <br />CITY COST PARTICIPATION <br />COUNTY COST PARTICIPATION <br />PRELIMINARY SCHEDULE "I" <br />City of Elk River and Sherburne County <br />S.A.P. 204-101-001S.A.P. 204-122-002S.A.P. 071-604-025 <br />S.P. 7102-135 Sanitary and Roadway Lighting (From Sheet No. 2) (City-performed CE)S.P. 204-090-004 Trail (From Sheet No. 4) (City-performed CE)Construction Subtotal (5% CE)Construction <br /> Engineering (5%)S.P. 204-090-004 Trail (From Sheet No. 4)S.P. 7102-135 ADA Improvements (From Sheet No. 5)S.A.P. 204-122-002 Signal System "A" (From Sheet No. 6)S.A.P. 204-101-001 Signal <br /> System "B" (From Sheet No. 7)State Furnished Materials (From Sheet No. 8) - Lump SumConstruction Subtotal (8% CE)Construction Engineering (8%)Construction + Construction Engineering <br /> SubtotalsPainted Poles Signal System "A" - Lump SumPainted Poles Signal System "B" - Lump SumTotal City ObligationTotal Anticipated Federal AidTotal City Obligation minus Anticipated <br /> Federal AidS.P. 7102-135 Signal System "A" (From Sheet No. 6)S.A.P. 071-601-025 Signal System "B" (From Sheet No. 7)State Furnished Materials (From Sheet No. 8) - Lump SumSubtotalConstruction <br /> Engineering (8%)Total County Cost <br />(1)(2) <br />(1) Amount of total City obligation as described in Article 7 of the Agreement (estimated amount)(2) Amount of advance City payment as described in Article 7 of the Agreement (estimated <br /> amount)(3)(3) Amount of advance County payment as described in Article 8 of the Agreement (estimated amount) <br />S.P. 7102-135 (T.H. 10=003)S.P. 204-090-004Fed. Proj. NHPP-TA 0010(337)Grading, concrete and bituminous surfacing, ADA improvements, signal systems, and lighting construction to start <br /> approximately spring 2021 underState Contract No. ____ with ____located on T.H. 10 from Simonet Drive to Lowell Avenue <br />Data is considered Non-public prior to project award. <br /> <br />