Staff does not see a need to impose specific conditions to satisfy this standard.
<br />4. mill be served adequately by and will not adversely affect essential public facilities and services including streets, police and fire
<br />protection, drainage, refuse disposal, water and sewer systems, parks and schools; and will not, in particular, create traf c
<br />congestion or interference with traffic on adjacent and neighboring public thoroughfares.
<br />The use will be served adequately by and will not adversely affect essential public facilities and services
<br />including streets, police and fire protection, drainage, refuse disposal, water and sewer systems, parks and
<br />schools; and will not, in particular, create traffic congestion or interference with traffic on adjacent and
<br />neighboring public thoroughfares.
<br />Staff does not see a need to impose specific conditions to satisfy this standard.
<br />5. mill not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any
<br />persons or property because of excessive traffic, noise, smoke, fumes, glare, odors, dust or vibrations.
<br />While the project is an expansion of the operations, the increase of traffic generated by the site will be
<br />minimal. The spacing of access points has been reviewed by the city engineer. Glare and noise generated
<br />from the site will be mitigated by vegetation, buildings, and elevations changes. The use will not involve
<br />uses, activities, processes, materials, equipment, and conditions of operation that will be detrimental to
<br />any persons or property because of excessive traffic, noise, smoke, fumes, glare, odors, dust, or vibrations.
<br />To ensure detrimental activities such as glare, noise, and traffic do not occur, the hours of operation shall
<br />be limited to Monday — Friday, 7:00 a.m. — 3:30 p.m., except for emergencies.
<br />6. mill not result in the destruction, loss or damage of a natural, scenic or historic feature of major importance.
<br />Although trees will be removed and significant site work will be completed, the use will not result in the
<br />destruction, loss or damage of a natural, scenic or historic feature of major importance.
<br />Staff does not see a need to impose specific conditions to satisfy this standard.
<br />7. WINfull comply with all other requirements of this Code, including any applicable requirements and standards for the
<br />issuance of a license or permit to establish and operate the proposed use in the city.
<br />The use will fully comply with all other requirements of this Code, including any applicable requirements
<br />and standards for the issuance of a license or permit to establish and operate the proposed use in the city.
<br />Staff does not see a need to impose specific conditions to satisfy this standard.
<br />If denial of such a permit should occur, it shall accompany recommendations or determinations by findings or a
<br />report stating how the proposed use does not comply with the standards set forth in Section 30-654.
<br />Financial Impact
<br />None
<br />Mission/Policy/Goal
<br />Reflect the culture of citizens and what is important (continue service to residents) and meeting the changing
<br />needs of the city.
<br />
|