My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.4. EDSR 12-21-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2014-2020
>
2020
>
12-21-2020
>
7.4. EDSR 12-21-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2020 8:35:32 AM
Creation date
12/18/2020 8:32:09 AM
Metadata
Fields
Template:
City Government
type
EDSR
date
12/21/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SUMMARY OF RESEARCH AND RECOMMENDED STRATEGIES <br />EDA STRATEGIC PLAN 8 <br />1. STRATEGY: HIGHWAY 169 REDEFINE <br />The reconstruction of Highway 169 raises concerns and presents opportunities. In the <br />short run it will present challenges for highway oriented businesses, with additional barriers <br />to access. In the long run the reconstruction will relieve traffic congestion that has itself <br />been an impediment to business success. It will make some properties along the freeway <br />more desirable for new development and redevelopment. And it will provide an opportunity <br />for enhancements that can contribute to Elk River’s branding. <br />Cities can impact highway design in ways that a) add artistic elements, distinctive features <br />or branding, b) ensure adequate wayfinding to highway oriented businesses and downtown <br />areas, c) maintain access to businesses during construction. The images below are taken <br />from highway redevelopment projects, and demonstrate construction enhancements that <br />have been done in other cities. <br />It would be timely for the City to engage substantively with the 169 Redefine project <br />planning in new ways to ensure that impacts to businesses are being mitigated, and <br />potential opportunities for City branding and beautification are part of the conversation. <br />I-35E Noise Wall, Vadnais Heights Burnsville Parkway Bridge, Burnsville <br />Strategies/Actions <br />1a. Prepare and implement a City advocacy strategy for the 169 Redefine project. It <br />should include a constructive statement of Elk River’s aspirations for desired <br />outcomes from the project, including elements such as signage to downtown Elk <br />River and enhancements that add distinctiveness to Elk River’s northern gateway. <br />It should note the importance of mitigating impacts to existing businesses, and of <br />providing effective temporary wayfinding and physical access. The strategy <br />would map out an action plan for sustained advocacy throughout the duration of <br />the project.
The URL can be used to link to this page
Your browser does not support the video tag.