Laserfiche WebLink
DocuSign Envelope ID: BCE22727-B3F4-40B7-AA4D-8AA95B6A8D07 <br />CONTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />APPLICATION NO.: <br />16 <br />containing Contractor's signed Certification <br />is attached. <br />APPLICATION DATE: 11130120 <br />In tabulations below, amounts are stated to the nearest dollar. <br />PERIOD TO: <br />11/30/20 <br />WEIDNER MECHANICAL <br />PROJECT NO.: <br />19520-0033 <br />A <br />B <br />C <br />- - - - - ---------- <br />D E <br />- <br />F <br />G <br />H <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />ITEM <br />DESCRIPTION OF WORK <br />SCHEDULED <br />FROM PREVIOUS <br />PRESENTLY <br />COMPLETED <br />% <br />BALANCE TO RE' rAINAGE (IF <br />NUM <br />VALUE <br />APPLICATION (D THIS PERIOD <br />STORED (NOT IN <br />AND STORED TO = <br />(G + C) <br />FINISH (C - G) VARIABLE RATE) <br />+ E) <br />0 OR E) <br />DATE <br />1 <br />10.105 Bond <br />$10,333.00 <br />$10,333.00 <br />$10,333001 <br />100.00%1 <br />.2 <br />10.1109AIlowance <br />i $7,500.001 <br />$7.500.00 <br />$7,500.001 <br />100.00%1 <br />3 <br />10.115 Pipe &Fittings <br />$23568900 <br />$235,689.00 <br />$235,689.00 <br />100.00%- <br />.4 <br />10.119 Drains & Carriers <br />$47,196.00 <br />$47,196.00 <br />$47,196.00 <br />100.00% 1 <br />15 <br />10.123 Pumps & Tanks <br />$5,400.00 <br />$5,400.00 <br />I <br />$5.400.00 <br />100.00% <br />16 <br />10.127 Water Heaters <br />$82,739.00 <br />$82,739,00 <br />$82,739.00 <br />100.00%9 <br />17 <br />10.137 Plumbing Fixtures & <br />i $79,004.00 <br />$79,004.00 <br />$79,004.00 <br />100.00%1 <br />1 Trim <br />10.139 Misc Plumbing <br />100.00%1 <br />8 <br />$42,488.00 <br />$42,488.00. <br />$42,488.00 <br />9 <br />11.185 Labor - Plumbl ng <br />$560,753.002 <br />$560,753.001 <br />$560,753.00 <br />100.00%1 <br />10 <br />130.300 Digging/Backfill <br />$37,034.00 <br />$37,034.00' <br />$37,034.001 <br />100.00% <br />11 <br />130.325 Rentals <br />$13,000.001 <br />$13,000.00 <br />$13,00.00 <br />100.00% <br />112 <br />130.360 Pipe Covering <br />$84.864.00. <br />I <br />$84,864.00 <br />$84,664.001 <br />i <br />100.00% <br />1 <br />Plumbing (CO #1) <br />$7,430.001 <br />$7,430.00. <br />$7,430.00 <br />100.00% <br />I <br />Plumbing (CO #2) <br />($2,203.00) <br />($2,203.00)l <br />tt <br />($2,203,00) <br />100.00%. <br />Plumbing (CO #3) <br />($2,980.00)1 <br />($2,980.00) <br />($2,980.00) <br />1100.00%, <br />1 <br />Plumbing (CO #4) <br />$2,506.00 <br />$2.506.00 <br />$2,506.00 <br />100.00% <br />1 <br />3Plumbing (CO #5) <br />$10,815.00 <br />$10,815.00 <br />$10,815.00 <br />100.00%1 <br />I <br />Plumbing (CO #6) <br />$1,338.00 <br />$1,338.00 <br />$1,330.00 <br />100.00%2 <br />1 <br />Plumbing (CO #7) <br />$15,209.00 <br />$15,209.00 <br />$15,209.00 <br />100.00%1 <br />1 <br />Plumbing (CO #8) <br />$2,645.00. <br />$2,645.001 <br />$2,645.00 <br />100.00% <br />1 <br />Plumbing (CO #9) <br />$10,615.00 i <br />$10,615.00 <br />$10,615.00 <br />100.00% <br />1 <br />Plumbing (CO #10) <br />$25, 562.001 <br />$25,562.00 <br />$25,562.0 0 <br />1 00. 00% <br />1 <br />Plumbing (CO #6) <br />$2,041.001 <br />$2,041.00 <br />$2,041.00 <br />100.00%1 <br />I <br />Plumbing (CO # 11) <br />$26,547.001 <br />$26,547.00 <br />$26,547.00 <br />100.00% <br />I <br />Plumbing (CO #112) <br />$1,943.00. <br />$1,943.00 <br />$1,943.00 <br />100.00%' <br />1 <br />Plumbing (CO #13) <br />$6,842.00 <br />$6,842001 <br />$6,842.00 <br />100.00% <br />I <br />Plumbing (CO #14) <br />$771.00 <br />$771.00 <br />$771.00 <br />100.00% <br />1 <br />Plumbing (CO #15) <br />$1,020.009 <br />$1,020.001 <br />3 <br />$1,020.002 <br />100.00% <br />Page 1 of 2 <br />