Laserfiche WebLink
CONTINUATION SHEET <br />Page 2of3 <br />Application and Certification for Payment, containing <br />Application No.: <br />18 <br />Contractor's signed certification is attached. <br />Application Date: <br />11/30120 <br />In tabulations below, amounts are stated to the nearest dollar. <br />To: <br />11130120 <br />Use Column I on Contracts when: variable retalnage for line items may apply. <br />Architect's Project No.: <br />Invoice ik : 9520003318 Contract : 19520.0033 Elk River Multi -Purpose Facility and Lion John Weicht Park <br />C <br />_ D <br />E <br />_ F <br />to <br />H <br />Item Description of Work <br />Scheduled <br />Work Completed <br />Materials <br />Total <br />% <br />Balance <br />Retainage <br />No. <br />Value <br />From Previous <br />This Period <br />Presently <br />Completed <br />(G 1 C) <br />To Finish <br />Application <br />In Place <br />Stored <br />and Stored <br />(C-0) <br />(D+E) <br />To Date <br />Not in D or <br />D+E+F <br />1 Elk River Multi -Purpose Facility and <br />0.00 <br />0.001 <br />0.00 _ <br />0.00 1 <br />0.00 <br />0.00% <br />0.00 <br />0.00 <br />Lion John Weicht Pads <br />1A Final Cleaning <br />82,346.55 <br />81,315.0 <br />1,031.55 l <br />0.00 <br />82,346.55 <br />100.00°h <br />0.00 i <br />2,084.54 <br />1 B Survey <br />25,568.00 <br />25,568.00 <br />0.00 <br />0.00 <br />25,568.00 <br />100.00% <br />0.00 <br />639.20 <br />2A Building Demolition <br />166,199 51 <br />166,199 51 <br />0.00 <br />0.00 _ <br />166,199.51 ; <br />100.00% <br />0.001 <br />4,154.99 <br />2B Selective Demolition <br />236,477.211 <br />236,477.21 <br />0.00 <br />0.001 <br />236,477.21 <br />100.00% <br />0.00 <br />5,911.93 <br />3C Concrete Floor Finishes <br />135,699 62 <br />135,699.62 <br />0.00 , <br />0.00 <br />135,699.62 <br />100 00% <br />0.00 <br />3,392.49 <br />4A Masonry Systems <br />2,982,936 83 <br />2,982,936 83 <br />0.00 <br />0.00. <br />2,982,936.83 <br />100.00% <br />0.00 <br />74,573.42 <br />5A Structural Material <br />1,342,525.131 <br />1,342,525.13 <br />0.00 <br />0.00 <br />1,342,525.13 <br />100.00% i <br />0.00 <br />33,080.06 <br />5B Structural Labor <br />457,855.001 <br />457,855 00 <br />0.00 <br />0.00 <br />457,855.00 <br />100.00%' <br />0.00E <br />11,455.52 <br />6A Carpentry <br />1,658,472.53 <br />1,656,489.71' <br />1,982 82 <br />D.00 <br />1,658,472.53 , <br />100.00% <br />0.001 <br />41,554.44 <br />7A Waterproofing &WB <br />40,342.00 <br />40,342.00' <br />0 00 l <br />0.00 <br />40,342.00 <br />100.00% = <br />0.00E <br />1,008.55 <br />7B Roofing Systems <br />1,067,619 73 <br />1,067,619,731 <br />0.00 <br />0.001 <br />1,067,619.73 j <br />100.00% <br />0.00 <br />26,690.49 <br />7C Metal Wall Panel <br />186172611 <br />186,172.61 <br />0.00 <br />0.00 <br />186,172.61 <br />100.00%1 <br />0.00 <br />4,654.31 <br />8A Aluminum Entrances/Storefronts <br />642:926.46 <br />642,926.46' <br />0.00 = <br />0.00= <br />642,926.46 <br />100.00% <br />0.00 <br />16,073.16 <br />88 Overhead Coiling and Sectional <br />53,610.00 = <br />63,610.0010.00 <br />_ <br />0.00 i <br />53,610.00 <br />100.00% <br />0.00 _ <br />1,340.25 <br />Doors <br />9A Gypsum Board <br />349,769.37' <br />349,769.37 <br />0.00' <br />0.1001 <br />349,769.37 ". <br />100.00% ; <br />0.00 <br />8,744.23 <br />98 Tiling <br />175,149.901 <br />175,14990= <br />0.00l <br />0.00 <br />175,149.90 <br />100.00% <br />0.00 <br />4,378.75 <br />9C Acoustical Ceilings <br />147,905 95 <br />147,905.95 <br />0.00 <br />0.001 <br />147,905.95 <br />100.00% <br />0,00 <br />3,697.65 <br />9D Flooring <br />132,262501 <br />132,262.503 <br />0.00 <br />0.00 <br />132,262.50 <br />100.00% <br />0.00 <br />3,306.56 <br />9E Painting <br />444,499:00 <br />444,499.00' <br />0.00 <br />0.00 <br />444,499.00 <br />100.00% <br />0.00' <br />11,256.97 <br />10A Signage <br />10,807 14' <br />10,807 14 <br />0.00 <br />0.00 <br />10,807.14 <br />100.00% <br />0.00 l <br />270.18 <br />11A Athletic Equipment <br />175,176.84. <br />175,176 84 <br />0.00 <br />0.00 <br />175,176.84 <br />100.00% <br />0.001 <br />4,379.43 <br />1113 Concessions <br />101,991.83 <br />101,991.83 <br />0.00 1 <br />0.00. <br />101,991.83 <br />100.00%'5 <br />0.00 ( <br />2,549.80 <br />12A Roller Shades <br />28,659.10. <br />28,659.10 <br />0.00 j <br />0.00 <br />28,659.10 <br />100.00% ; <br />0.00 I <br />716.48 <br />13B Ice Rink Systems <br />2,162742.00 j <br />2,162,742 00 <br />0.00 ' <br />0.00 <br />2,162,742.00 <br />100.00% <br />0.001 <br />54,068.55 <br />13C Leg Truss System <br />125:797.001 <br />125,797.00 <br />0.00 <br />0.00' <br />125,797.00 <br />100.00% : <br />0.001 <br />3,144.92 <br />14A Elevators <br />71,700.00 <br />71,700 00 <br />0.00 <br />0.00 <br />71,700.00 <br />100.00% <br />0.00 <br />1,792,50 <br />21A Fire Protection <br />282,544.00 <br />282,544 00 <br />0.00 <br />0.00 <br />282,544.00 <br />100.00%' <br />0.00 ��� <br />7,073.61 <br />22A Plumbing Systems <br />1.324,981.22 <br />1,323,097.00 <br />1,884 22 <br />0.001 <br />1,324,981.22 _ <br />100.00% E <br />0.00' <br />33,171.63 <br />23A HVAC <br />1,875,065 33' <br />1,875,065.33' <br />0.00- <br />0.00 <br />1,875,065.33 <br />100.00% <br />0.00 <br />46,876.63 <br />26A Electrical Systems <br />1,876,978.67 1 <br />1.876,978 67 <br />0.00 <br />0.00 `. <br />1,876,978.671 <br />100.00% <br />0.00 _ <br />46,998.67 <br />31A Multipurpose Earthwork <br />714,137.30 i <br />714,137.30 <br />0.00 <br />0.00 <br />714,137.30 <br />100.00% <br />0.00 <br />17,922.26 <br />