Laserfiche WebLink
CONTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />APPLICATION NO.: <br />7 <br />containing Contractor's signed Certification is attached. <br />APPLICATION DATE: <br />11/05/20 <br />In tabulations <br />below, amounts are stated to the nearest dollar. <br />PERIOD <br />TO: <br />11/30/20 <br />Bituminous Roadways, Inc. <br />PROJECT NO.: <br />19520-0033 <br />A <br />B <br />C <br />D E <br />F <br />G <br />H I <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />ITEM <br />DESCRIPTION OF WORK <br />SCHEDULED <br />FROM PREVIOUS <br />PRESENTLY <br />COMPLETED <br />% <br />BALANCE TO RETAINAGE (IF <br />NUM <br />VALUE <br />APPLICATION (D THIS PERIOD <br />STORED (NOT IN <br />AND STORED TO <br />(G + C) <br />FINISH (C - G) VARIABLE RATE) <br />+ E) <br />D OR E) <br />DATE <br />1 <br />Mobilization <br />$16,425.00 <br />$16,425.00 <br />$16,425.00 <br />100.00% <br />2 <br />Utility Patching <br />$27,311.00 <br />$27,311.00 <br />$27,311.00 <br />100.00% <br />3 <br />Lion Park Drive Grading <br />$8,850.00 <br />$8,850.00 <br />$8,850.00 <br />100.00% <br />4 <br />Lions Park Light Duty <br />$21,107.00 <br />$21,107.00 <br />$21,107.00 <br />100.00% <br />Bituminous <br />5 <br />Lions Park Medium Duty <br />$106,732.00 <br />$106,732.00 <br />$106,732.00 <br />100.00% <br />Bituminous <br />6 <br />Ice Arena Heavy Duty <br />$97,750.00 <br />$97,750.00 <br />$97,750.00 <br />100.00% <br />Bituminous <br />7 <br />Ice Arena Aggregate Surfacing <br />$15,735.00 <br />$15,735.00 <br />$15,735.00 <br />100.00% <br />8 <br />Utility Adjustments in <br />$8,250.00 <br />$8,250.00 <br />$8,250.00 <br />100.00% <br />Pavement <br />9 <br />Striping & Lot Marking <br />$1,500.00 <br />$1,500.00 <br />$1,500.00 <br />100.00% <br />10 <br />Traffic Signage <br />$5,440.00 <br />$5,440.00 <br />$5,440.00 <br />100.00% <br />11 <br />Allowance <br />$15,000.00 <br />$15,000.00 <br />$15,000.00 <br />100.00% <br />1 <br />Asphalt Paving (CO #1) <br />$5,614.00 <br />$5,614.00 <br />$5,614.00 <br />100.00% <br />1 <br />Asphalt Paving (CO #2) <br />$1,650.00 <br />$1,650.00 <br />$1,650.00 <br />100.00% <br />1 <br />Asphalt Paving (CO #3) <br />($26,095.00) <br />($26,095.00) <br />($26,095.00) <br />100.00% <br />1 <br />Asphalt Paving (CO #4) <br />($11,000.00) <br />($11,000.00) <br />($11,000.00) <br />100.00% <br />1 <br />Asphalt Paving (CO #5) <br />($780.00) <br />($780.00) <br />($780.00) <br />100.00% <br />1 <br />Asphalt Paving (CO #6) <br />$1,020.00 <br />$1,020.00 <br />$1,020.00 <br />100.00% <br />PAYMENT TOTALS <br />$294,509.00 <br />$293,489.00 $1,020.00 <br />$294,509.00 <br />100.00% <br />Page 1 of 1 <br />