Laserfiche WebLink
CONTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />APPLICATION NO.: <br />4 <br />containing Contractor's signed Certification is attached. <br />APPLICATION DATE: <br />11/09/20 <br />In tabulations below, amounts are stated to the nearest dollar. <br />PERIOD <br />TO: <br />11/30/20 <br />US SiteWork, Inc <br />PROJECT NO.: <br />19520-0033 <br />A B <br />C <br />D <br />E F <br />G <br />H I <br />WORK COMPLETED MATERIALS <br />TOTAL <br />ITEM DESCRIPTION OF WORK <br />SCHEDULED <br />FROM PREVIOUS <br />PRESENTLY <br />COMPLETED <br />% <br />BALANCE TO RETAINAGE (IF <br />NUM <br />VALUE <br />APPLICATION (D <br />THIS PERIOD STORED (NOT IN <br />AND STORED TO <br />(G + C) <br />FINISH (C - G) VARIABLE RATE) <br />+ E) <br />D OR E) <br />DATE <br />1 Allowance <br />$20,000.00 <br />$20,000.00 <br />$20,000.00 <br />100.00% <br />2 Erosion Control <br />$26,989.00 <br />$26,989.00 <br />$26,989.00 <br />100.00% <br />3 Site Clearing/Demolition <br />$56,333.00 <br />$56,333.00 <br />$56,333.00 <br />100.00% <br />4 Sitework <br />$372,803.00 <br />$372,803.00 <br />$372,803.00 <br />100.00% <br />5 Building Excavation <br />$21,075.00 <br />$21,075.00 <br />$21,075.00 <br />100.00% <br />6 Bond <br />$5,000.00 <br />$5,000.00 <br />$5,000.00 <br />100.00% <br />1 Lions Park Earthwork (CO #1) <br />($1,975.00) <br />($1,975.00) <br />($1,975.00) <br />100.00% <br />1 Lions Park Earthwork (CO #2) <br />$4,075.00 <br />$4,075.00 <br />$4,075.00 <br />100.00% <br />1 Lions Park Earthwork (CO #4) <br />($1,164.68) <br />($1,164.68) <br />($1,164.68) <br />100.00% <br />1 Lions Park Earthwork (CO #5) <br />($2,452.32) <br />($2,452.32) <br />($2,452.32) <br />100.00% <br />1 Lions Park Earthwork (CO #6) <br />($2,350.00) <br />($2,350.00) <br />($2,350.00) <br />100.00% <br />2 Geogrid (CO #3) <br />$990.50 <br />$990.50 <br />$990.50 <br />100.00% <br />1 Lions Park Earthwork (CO #1) <br />($3,868.65) <br />($3,868.65) <br />($3,868.65) <br />100.00% <br />1 Lions Park Earthwork (CO #7) <br />($7,526.35) <br />($7,526.35) <br />($7,526.35) <br />100.00% <br />1 Lions Park Earthwork (CO #8) <br />($2,325.00) <br />($2,325.00) <br />($2,325.00) <br />100.00% <br />PAYMENT TOTALS <br />$485,603.50 <br />$487,928.50 <br />($2,325.00) <br />$485,603.50 <br />100.00% <br />Page 1 of 1 <br />