Laserfiche WebLink
CONTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />APPLICATION NO.: <br />15 <br />containing Contractor's signed Certification is attached. <br />In tabulations <br />below, amounts are stated to the nearest dollar. <br />APPLICATION <br />DATE: <br />10/22/20 <br />PERIOD <br />TO: <br />10/31/20 <br />Design Electric, Inc <br />PROJECT NO.: <br />19520-0033 <br />A <br />B <br />C <br />D E <br />F <br />G <br />H I <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />ITEM <br />DESCRIPTION OF WORK <br />SCHEDULED <br />FROM PREVIOUS <br />PRESENTLY <br />COMPLETED <br />% <br />BALANCE TO RETAINAGE (IF <br />NUM <br />VALUE <br />APPLICATION (D THIS PERIOD <br />STORED (NOT IN <br />AND STORED TO <br />(G + C) <br />FINISH (C - G) VARIABLE RATE) <br />+ E) <br />D OR E) <br />DATE <br />1 <br />BOND/PERMIT <br />$35,908.00 <br />$35,908.00 <br />$35,908.00 <br />100.00% <br />/MOBILIZATION <br />2 <br />SITE WORK/UNDERGROUND <br />$33,158.00 <br />$33,158.00 <br />$33,158.00 <br />100.00% <br />3 <br />DEMOLITION/TEMP WIRING <br />$64,200.00 <br />$64,200.00 <br />$64,200.00 <br />100.00% <br />4M <br />CONDUIT -MATERIAL <br />$122,167.00 <br />$122,167.00 <br />$122,167.00 <br />100.00% <br />4L <br />CONDUIT - LABOR <br />$180,320.00 <br />$180,320.00 <br />$180,320.00 <br />100.00% <br />5M <br />BOXES/WIRE/DEVICES - <br />$110,400.00 <br />$110,400.00 <br />$110,400.00 <br />100.00% <br />MATERIAL <br />5L <br />BOXES/WIRE/DEVICES - <br />$67,200.00 <br />$67,200.00 <br />$67,200.00 <br />100.00% <br />LABOR <br />6M <br />FIXTURES - MATERIAL <br />$425,654.00 <br />$425,654.00 <br />$425,654.00 <br />100.00% <br />6L <br />FIXTURES - LABOR <br />$90,400.00 <br />$90,400.00 <br />$90,400.00 <br />100.00% <br />7M <br />GEAR - MATERIAL <br />$145,168.00 <br />$145,168.00 <br />$145,168.00 <br />100.00% <br />7L <br />GEAR - LABOR <br />$38,400.00 <br />$38,400.00 <br />$38,400.00 <br />100.00% <br />8M <br />LOW VOLTAGE ROUGH -IN - <br />$46,722.00 <br />$46,722.00 <br />$46,722.00 <br />100.00% <br />MATERIAL <br />8L <br />LOW VOLTAGE ROUGH -IN - <br />$73,120.00 <br />$73,120.00 <br />$73,120.00 <br />100.00% <br />LABOR <br />9M <br />EQUIPMENT CONNECTIONS <br />$68,400.00 <br />$68,400.00 <br />$68,400.00 <br />100.00% <br />- MATERIAL <br />9L <br />EQUIPMENT CONNECTIONS <br />$12,200.00 <br />$12,200.00 <br />$12,200.00 <br />100.00% <br />-LABOR <br />10M <br />FIRE ALARM - MATERIAL <br />$84,697.00 <br />$84,697.00 <br />$84,697.00 <br />100.00% <br />10L <br />FIRE ALARM - LABOR <br />$20,000.00 <br />$20,000.00 <br />$20,000.00 <br />100.00% <br />11M <br />SOFTBALL FIELD - <br />$153,200.00 <br />$153,200.00 <br />$153,200.00 <br />100.00% <br />MATERIAL <br />11L <br />SOFTBALL FIELD - LABOR <br />$15,600.00 <br />$15,600.00 <br />$15,600.00 <br />100.00% <br />12 <br />- <br />1 <br />Electrical (CO #1) <br />$945.49 <br />$945.49 <br />$945.49 <br />100.00% <br />1 <br />Electrical (CO #2) <br />$1,340.58 <br />$1,340.58 <br />$1,340.58 <br />100.00% <br />1 <br />Electrical (CO #3) <br />$1,582.00 <br />$1,582.00 <br />$1,582.00 <br />100.00% <br />Page 1 of 2 <br />