Laserfiche WebLink
CONTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />APPLICATION NO.: <br />7 <br />containing Contractor's signed Certification is attached. <br />APPLICATION DATE: <br />11/03/20 <br />In tabulations <br />below, amounts are stated to the nearest dollar. <br />PERIOD <br />TO: <br />10/31/20 <br />Distinctive Iron LLC <br />PROJECT NO.: <br />19520-0033 <br />A <br />B <br />C <br />D <br />E F <br />G <br />H I <br />WORK COMPLETED MATERIALS <br />TOTAL <br />ITEM <br />DESCRIPTION OF WORK <br />SCHEDULED <br />FROM PREVIOUS <br />PRESENTLY <br />COMPLETED <br />% <br />BALANCE TO RETAINAGE (IF <br />NUM <br />VALUE <br />APPLICATION (D <br />THIS PERIOD STORED (NOT IN <br />AND STORED TO <br />(G + C) <br />FINISH (C - G) VARIABLE RATE) <br />+ E) <br />D OR E) <br />DATE <br />1 <br />Bond <br />$22,896.00 <br />$22,896.00 <br />$22,896.00 <br />100.00% <br />2 <br />Start Up - Shop Drawings <br />$75,000.00 <br />$75,000.00 <br />$75,000.00 <br />100.00% <br />3 <br />Steel: Structural <br />$278,353.00 <br />$278,353.00 <br />$278,353.00 <br />100.00% <br />4 <br />Steel: Joist and Deck <br />$767,104.00 <br />$767,104.00 <br />$767,104.00 <br />100.00% <br />5 <br />Steel: Misc <br />$150,000.00 <br />$150,000.00 <br />$150,000.00 <br />100.00% <br />6 <br />Allowance <br />$15,000.00 <br />$15,000.00 <br />$15,000.00 <br />100.00% <br />1 <br />Structural Steel (CO #1) <br />$534.38 <br />$534.38 <br />$534.38 <br />100.00% <br />1 <br />Structural Steel (CO #2) <br />$18,117.98 <br />$18,117.98 <br />$18,117.98 <br />100.00% <br />1 <br />Structural Steel (CO #3) <br />$6,888.15 <br />$6,888.15 <br />$6,888.15 <br />100.00% <br />1 <br />Structural Steel (CO #4) <br />$2,133.23 <br />$2,133.23 <br />$2,133.23 <br />100.00% <br />1 <br />Structural Steel (CO #6) <br />$3,259.69 <br />$3,259.69 <br />$3,259.69 <br />100.00% <br />1 <br />Structural Steel (CO #7) <br />($332,879.00) <br />($332,879.00) <br />($332,879.00) <br />100.00% <br />1 <br />Structural Steel (CO #8) <br />$4,141.41 <br />$4,141.41 <br />$4,141.41 <br />100.00% <br />1 <br />Structural Steel (CO #9) <br />$8,680.34 <br />$8,680.34 <br />$8,680.34 <br />100.00% <br />1 <br />Structural Steel (CO #10) <br />$2,149.90 <br />$2,149.90 <br />$2,149.90 <br />100.00% <br />1 <br />Structural Steel (CO #10) <br />$1,400.31 <br />$1,400.31 <br />$1,400.31 <br />100.00% <br />1 <br />Structural Steel (CO #5) <br />- <br />1 <br />Structural Steel (CO #11) <br />($3,040.00) <br />($3,040.00) <br />($3,040.00) <br />100.00% <br />1 <br />Structural Steel (CO #12) <br />$5,564.98 <br />$5,564.98 <br />$5,564.98 <br />100.00% <br />1 <br />Structural Steel (CO #13) <br />$8,286.10 <br />$8,286.10 <br />$8,286.10 <br />100.00% <br />1 <br />Structural Steel (CO #14) <br />$5,210.16 <br />$5,210.16 <br />$5,210.16 <br />100.00% <br />1 <br />Structural Steel (CO #15) <br />($38,383.88) <br />($38,383.88) <br />($38,383.88) <br />100.00% <br />PAYMENT TOTALS <br />$1,000,416.75 <br />$1,019,739.39 <br />($19,322.64) <br />$1,000,416.75 <br />100.00% <br />Page 1 of 1 <br />