<br />§ 4.1.2 Description of Supplemental Services
<br />(Paragraphs deleted)
<br />§ 4.1.2.1 A description of each Supplemental Service identified in Section 4.1.1 as the Architect’s responsibility is
<br />provided below.
<br /> (Describe in detail the Architect’s Supplemental Services identified in Section 4.1.1 or, if set forth in an exhibit,
<br /> identify the exhibit. The AIA publishes a number of Standard Form of Architect’s Services documents that can be
<br /> included as an exhibit to describe the Architect’s Supplemental Services.)
<br /> T.B.D. and coordinated between Owner and Architect if required.
<br />§ 4.1.2.2 A description of each Supplemental Service identified in Section 4.1.1 as the Owner’s responsibility is
<br />provided below.
<br /> (Describe in detail the Owner’s Supplemental Services identified in Section 4.1.1 or, if set forth in an exhibit, identify
<br />the exhibit.)
<br /> T.B.D. and coordinated between Owner and Architect if required.
<br />§ 4.1.3 If the Owner identified a Sustainable Objective in Article 1, the Architect shall provide, as a Supplemental
<br />Service, the Sustainability Services required in AIA Document E204™–2017, Sustainable Projects Exhibit, attached
<br />to this Agreement. The Owner shall compensate the Architect as provided in Section 11.2.
<br /> § 4.2 Architect’s Additional Services
<br />The Architect may provide Additional Services after execution of this Agreement without invalidating the Agreement.
<br />Except for services required due to the fault of the Architect, any Additional Services provided in accordance with this
<br />Section 4.2 shall entitle the Architect to compensation pursuant to Section 11.3 and an appropriate adjustment in the
<br />Architect’s schedule.
<br />§ 4.2.1 Upon recognizing the need to perform the following Additional Services, the Architect shall notify the Owner
<br />with reasonable promptness, but in any event no later than thirty (30) days from the event necessitating Additional
<br />Services, and explain the facts and circumstances giving rise to the need. The Architect shall not proceed to provide
<br />the following Additional Services until the Architect receives the Owner’s written authorization:
<br />.1 Services necessitated by a change in the Initial Information, previous instructions or approvals given by
<br />the Owner, or a material change in the Project including size, quality, complexity, the Owner’s
<br />schedule or budget for Cost of the Work, or procurement or delivery method;
<br />.2 Services necessitated by the enactment or revision of codes, laws, or regulations, including changing or
<br />editing previously prepared Instruments of Service;
<br />.3 Changing or editing previously prepared Instruments of Service necessitated by official interpretations of
<br />applicable codes, laws or regulations that are either (a) contrary to specific interpretations by the
<br />applicable authorities having jurisdiction made prior to the issuance of the building permit, or (b)
<br />contrary to requirements of the Instruments of Service when those Instruments of Service were
<br />prepared in accordance with the applicable standard of care;
<br />.4 Services necessitated by decisions of the Owner not rendered in a timely manner or any other failure of
<br />performance on the part of the Owner or the Owner’s consultants or contractors;
<br />.5 Preparing digital models or other design documentation for transmission to the Owner’s consultants and
<br />contractors, or to other Owner-authorized recipients;
<br />.6 Preparation of design and documentation for alternate bid or proposal requests proposed by the Owner;
<br />.7 Preparation for, and attendance at, a public presentation, meeting or hearing;
<br />.8 Preparation for, and attendance at, a dispute resolution proceeding or legal proceeding, except where the
<br />Architect is party thereto;
<br />.9 Evaluation of the qualifications of entities providing bids or proposals;
<br />.10 Consultation concerning replacement of Work resulting from fire or other cause during construction; or,
<br />.11 Assistance to the Initial Decision Maker, if other than the Architect.
<br />§ 4.2.2 To avoid delay in the Construction Phase, the Architect shall provide the following Additional Services, notify
<br />the Owner with reasonable promptness, but in any event no later than thirty (30) days from the event necessitating
<br /> ™
<br />AIA Document B101 Copyright © 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The “American
<br /> – 2017.
<br />Init.
<br /> Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was
<br />13
<br />produced by AIA software at 10:15:59 ET on 11/23/2020 under Order No.9712742774 which expires on 08/13/2021, is not for resale, is licensed for one-time use
<br />®
<br />/
<br />only, and may only be used in accordance with the AIA Contract Documents Terms of Service. To report copyright violations, e-mail copyright@aia.org.
<br />User Notes: (1800630329)
<br />137
<br />
|