My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2 ERMUSR 12-08-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2020
>
12-08-2020
>
5.2 ERMUSR 12-08-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2020 3:20:16 PM
Creation date
12/4/2020 3:20:16 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MORATORIUM EFFECTIVE FEBRUARY 14, 2017 ON THE FOLLOWING LOAD CONTROL PROGRAMS <br /> <br />Energy Management Program Rates <br /> <br />ERMU shall provide: <br /> <br />1.All electric energy consumed by the ETS water heater at $.0463 per kWh. <br />2.This equipment will be energized only for 8 off-peak hours daily. <br />3.A meter to measure electricity consumed by the ETS water heater. <br />4.A load control device and meter socket to accommodate the off-peak meter. <br /> <br />Rate is subject to application of Power Cost Adjustment (PCA). <br /> <br />Federal, state, and local taxes may apply. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Adopted December 817, 202019 <br />Revised January 14, 2020 <br />Effective January 1, 20210 <br />Page 3 of 3 <br />116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.