Laserfiche WebLink
<br /> <br /> <br /> <br /> <br />MORATORIUM EFFECTIVE FEBRUARY 14, 2017 ON THE FOLLOWING LOAD CONTROL PROGRAMS <br /> <br />ENERGY MANAGEMENT PROGRAM RATES <br /> <br />Available: Within Elk River Municipal Utilities (ERMU) established service territory. <br /> <br />Applicable: To single family residences, non-demand and demand customers receiving service under <br />another rate, who add a second meter for any of the following controlled loads: <br /> <br />Dual Fuel Space Heating Rate: This Program is available to residential customers only. A dual fuel space <br />heating system consists of an electric heating system and a secondary non-electric space heating system <br />both capable of heating the living space at design conditions. Interruptions of the electric heating <br />system will usually occur for up to 12 hours daily on peak winter days and a maximum of 400 hours per <br />heating season. <br /> <br /> To qualify for the special rate, the customer shall provide: <br /> <br />1.An electric space heating system which can be interrupted by a single 5 amp rated relay. <br />2.A secondary non-electric space heating system capable of automatic start-up and continuous <br />operation upon interruption of the electric heating system. <br />3.Obtain a load control device furnished by ERMU. <br />4.Accommodations for a meter and load control device and associated wiring installed according <br />to the applicable electrical codes, and installed by a qualified electrician. <br />5.Inspection by a State certified electrical inspector and a representative of ERMU. <br />6.Radiant heat in the slab of the building qualifies for dual fuel, not electric thermal storage. <br />7.Dual Fuel is not allowed in garages, pole sheds, or any structure that does not confirm to the <br />residential building code. <br />8.Exceptions by management approval only. <br /> <br />ERMU shall provide: <br /> <br />1.All electric energy consumed by the primary electric heating system at $.0602 per kWh. <br /> <br />2.During peak load conditions, ERMU will turn customer controlled electrical heat off for extended <br />periods of time as stated above. <br />3.A meter to measure electricity consumed by the electric heating system. <br />4.A load control device and meter socket to accommodate the meter. <br /> <br />Rate is subject to application of Power Cost Adjustment (PCA). <br /> <br />Federal, state and local taxes may apply. <br /> <br /> <br />Page 1 of 3 <br />114 <br />