My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2 ERMUSR 12-08-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2020
>
12-08-2020
>
5.2 ERMUSR 12-08-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2020 3:20:16 PM
Creation date
12/4/2020 3:20:16 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Large Industrial Demand Electric Service Rate <br /> <br />Determination of Billing Demand: The billing demand shall be the highest measured demand (corrected <br />for power factor if required) during any fifteen (15) minute period occurring in the current billing period. <br /> <br />Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous <br />demand, such as welders and X-ray machines, shall be required to pay all non-betterment costs of <br />isolating the system so that the load will not unduly interfere with <br /> lines. No motor larger than ten (10) HP (or 7.355 kW) will be allowed to be across- <br />the-line started without notification and written authorization from ERMU. <br /> <br />Power Factor Adjustment: Power factor adjustments may be made in the billing demand, when the <br />tment, is lower than 95%, the monthly demand <br /> <br /> <br />Billing and Terms of Payment: See ERMU Service Policies Policy (Billing Due Dates, and Penalties and <br />Delinquent Notices.) <br /> <br />Terms and Conditions: <br /> <br />1.Usage may be fractionalized on the actual days of service for application of a change in rate. <br /> <br />2.Service will be furnished pursuant to ERMU rules. <br /> <br />3. <br />governing Extension of Service and Facilities. <br /> <br />4.The rates set forth herein may be modified by the amount of any governmental changes <br />imposed and levied on transmission, distribution, production, or the sale of electrical power. <br /> <br />5.Exceptions by management approval only. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Adopted December 817, 202019 <br />Effective January 1, 20210 <br />Page 2 of 2 <br />105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.