My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2 ERMUSR 12-08-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2020
>
12-08-2020
>
5.2 ERMUSR 12-08-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2020 3:20:16 PM
Creation date
12/4/2020 3:20:16 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Non-Demand Electric Service Rate <br />Federal, state, and local taxes may apply. <br /> <br />Minimum Bill: The Basic Monthly Electric Charge plus $1.00 per kW per month of excess transformer <br />capacity requested by customer. <br /> <br />In the case of equipment having abnormally low annual utilization factors or unusual operating <br />characteristics, special minimum charges may be prescribed by ERMU. <br /> <br />Power Factor Adjustment: The rates set forth in this schedule are based on the maintenance by the <br />Customer of a power factor of not less than 95% at all times. If the power factor, as measured by the <br />electric department, is lower than 95%, the monthly demand charge may be multiplied by the ratio 95% <br />divided by the measured power factor, or at option, the power factor may be corrected at the <br /> <br /> <br />Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous <br />demand, such as welders and X-ray machines, shall be required to pay all non-betterment costs of <br />isolating the load from the balance of lines. No motor larger than ten (10) HP (or 7.355 kW) will <br />be allowed to be across-the-line started without notification and written authorization from ERMU. In <br />addition, Customers who fail to provide adequate corrective equipment shall be required to own and <br />maintain their own transformers. <br /> <br />Billing and Terms of Payment: See ERMU Service Policies Policy (Billing Due Dates, and Penalties and <br />Delinquent Notices.) <br /> <br />Terms and Conditions: <br /> <br />1.Usage may be fractionalized on the actual days of service for application of a change in rate or <br />changing from summer to winter or from winter to summer rates. <br /> <br />2.Service will be furnished rules. <br /> <br />3.Extensions made for service under this schedule are subject to the provisions of rules <br />governing Extension of Service and Facilities. <br /> <br />4.The rate set forth herein may be modified by the amount of any governmental changes imposed <br />and levied on transmission, distribution, production, or the sale of electrical power. <br /> <br />5.Exceptions by management approval only. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Adopted December 817, 202019 <br />Effective January 1, 20210 <br />Page 2 of 2 <br />99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.