Laserfiche WebLink
FIRST FLOOR <br />100' -0" <br />T.O. PARAPET <br />WALL <br />129' -0" <br />AREA A LEVEL 2 <br />114' -0" <br />D1 <br />A3.11 <br />A1 <br />A3.11 123456789101112131415161718 <br />A3 <br />A3.11 <br />118-3 118-2 <br />118-1 117-2 117-1 116-2 106-1 <br />6 <br />7 10 <br />8 9 11 <br />C1 <br />A3.10 <br />ABC <br />112-5 <br />16 <br />A1 <br />A3.10 <br />DEF <br />116-1 112-8 112-7 112-6 <br />14 15 <br />12 13 <br />07 6200.A9 03 4500.A2 <br />FINISH 1, TYP. <br />03 4500.A2 <br />FINISH 2, TYP. <br />A1 <br />A10.1 <br />C1 <br />A10.1 <br />D1 <br />A10.1 <br />TYP. <br />TYP. <br />TYP. <br />10 1400.H1 <br />SEE SCHEDULE, TYP. <br />10 1400.H1 <br />SEE SCHEDULE, TYP.10' - 11" 10' - 0" 8' - 1" <br />1. DO NOT SCALE DRAWINGS FOR BUILDING <br />PURPOSES. USE PLAN INFORMATION, <br />DIMENSIONS, DETAILS, SHOP DRAWINGS <br />AND FIELD VERIFICATION. <br />2. GENERAL CONTRACTOR SHALL VERIFY ALL <br />DIMENSIONS AND CONDITIONS OF THE SITE <br />AND EXISTING BUILDING, AND REPORT ANY <br />DISCREPANCIES TO THE ARCHITECT <br />BEFORE COMMENCING WITH ANY WORK. <br />3. GENERAL CONTRACTOR AND ALL <br />SUBCONTRACTORS SHALL BECOME <br />FAMILIAR WITH THE SITE AND EXISTING <br />CONDITIONS DURING THE BID PERIOD. <br />SUBMITTING A BID FOR THE WORK <br />CONSTITUTES AN UNDERSTANDING BY THE <br />CONTRACTOR/SUBCONTRACTOR OF THESE <br />CONDITIONS. <br />4. PAINT ALL EXTERIOR EXPOSED STEEL WITH <br />EPOXY PAINT, TYP. <br />5. ALL EXPOSED WELDS SHALL BE <br />CONTINUOUS, GRIND SMOOTH. <br />General Notes Key Plan <br />A3.1 <br />C1 <br />A3.2 <br />C1 <br />D1A3.2 <br />A3.2 <br />A1 <br />PARTIALPARTIAL <br />A3.1 <br />A1 <br />WHOLE <br />A3.3 <br />C1 <br />A3.3 <br />A1 <br />PARTIALPARTIAL <br />WHOLE <br />D1 A3.3 <br />The above drawings, specifications and ideas, design and arrangements represented are and shall remain the property of the Architect, and no part shall be copied, disclosed to others, or used in connection with any other project for which they they have been prepared and developed without the written permission of the Architect. Visual contact with these drawings or specifications shall constitute conclusive evidence of these restrictions.I hereby certify that this plan, specification, or report was prepared by me or under my directsupervision, and that I am a duly Licensed Architect under the laws of the State of Minnesota.Architect: Michael Schellin, AIA© 2020 Kodet Architectural Group, Ltd.License Number: 43591DateDate:Drawn By:Project No.:Checked By:1 2 3 4 5 <br />D <br />C <br />B <br />A 1/1/2020NOT FOR CONSTUCTION KODET ARCHITECTURAL GROUP15 Groveland Terrace | Minneapolis, MN 55403-1154612.377.2737Kodet Architectural Group, Ltd.| www.kodet.com11/18/2020 11:11:46 AM11/18/2020 11:11:46 AM C:\Users\office\Documents\108820_Elk River Municipal Utility Building_DD-2_Office.rvt108820AuthorCheckerField Service BuildingA3.3 <br />Elevations Elk River, MinnesotaElk River Municipal UtilitiesRevisions1/8" = 1'-0"A3.3 <br />D1 SOUTH ELEVATION <br />1/8" = 1'-0"A3.3 <br />A1 ENLARGED EAST ELEV. AT OFFICES <br />1/8" = 1'-0"A3.3 <br />C1 ENLARGED EAST ELEV. AT STORAGE <br />Material Keying LegendGraphic Scale Key Plan <br />03 4500.A2 Insulated Architectural Precast <br />Concrete Panel <br />07 6200.A9 Metal Coping (Cap Flashing) <br />10 1400.H1 Vinyl Signage <br />1/8" = 1' -0" <br />0'4'8'16'