My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 11-16-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
11-16-2020
>
4.5. SR 11-16-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2020 12:06:27 PM
Creation date
11/13/2020 11:33:01 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our main facility (Waite Park) includes the offices of all our professional and graduate engineers, <br />project managers, engineering technicians and office support. In addition, we have three laboratories <br />in-house: <br />Our soil testing laboratory has updated and calibrated soil testing equipment such as automated <br />proctor machines, sieve shakers and screens, permeability apparatus, ovens, and other equipment <br />and supplies necessary to complete all soil tests. All personnel working in our soil laboratory are <br />extensively trained and supervised by Chad Wolney, Vice President and the Soil Laboratory <br />Manager. <br />Our concrete laboratory consists of a climate -controlled steam room used to cure concrete, mortar, <br />and grout samples cast at project sites as required by the American Society of Testing Materials <br />(ASTM). In addition, we have two regularly calibrated and inspected compression machines used to <br />determine the strength of the properly cured samples. The concrete laboratory technicians are <br />directly supervised by Tyler Burkes, EIT. <br />Our bituminous testing laboratory has a gyratory compactor, incinerator ovens, shakers, and various <br />other equipment used to perform tests to determine the properties and verify specifications are met. <br />The bituminous lab technicians are supervised directly by Kevin Reller, majority owner and <br />President. <br />Having all our personnel housed in one facility allows constant communication between our <br />employees at the construction site, lab employees, project managers and engineers, and office <br />personnel responsible for submission of test reports. We pride ourselves on procuring accurate test <br />results in short order, allowing for proper project management of all the projects we provide services <br />for. <br />Over the past 29 years we have been in business, we have ensured quality construction on over <br />10,000 projects of various type including infiltration basins, housing developments, street <br />rehabilitations, sewer and water installations, airport runways, schools, hospitals, water treatment <br />plants, wind towers, solar farms, landfills, single-family residences, apartment building complexes, <br />manure basins, and gravel explorations, and many commercial buildings such as this project. <br />Although our clients vary from architects, engineers, developers, cities, counties, homeowners, and <br />the State of Minnesota, our recommendations and services are always provided with the same goal <br />of ensuring quality construction of all projects. <br />PROJECT PERSONNEL <br />All our laboratory and field technicians are extensively trained and certified by Minnesota <br />Department of Transportation (MnDOT), American Concrete Institute (ACI), and American Welding <br />Society (AWS). All testing is performed accurately and consistently with standards established by <br />American Society of Testing and Materials (ASTM) and the State of Minnesota. We have reviewed <br />
The URL can be used to link to this page
Your browser does not support the video tag.