Laserfiche WebLink
ITT Proposal #11-01 <br />City of Elk River <br />Public Safety Project Expansion Improvement <br />Elk River, Minnesota <br />cost Proposal: <br />Buildinq Scope <br />Description <br />Qty. <br />Unit Rate <br />Extension <br />Project Management, hourly <br />8 <br />$ <br />85.00 <br />$ <br />680.00 <br />Reinforcing Bar Inspection, each <br />20 <br />$ <br />85.00 <br />$ <br />1,700.00 <br />Special Inspections & Site Observations, hourly <br />50 <br />$ <br />85.00 <br />$ <br />4,250.00 <br />Excavation Observation Review & Report by P.E., each <br />1 <br />$ <br />375.00 <br />$ <br />375.00 <br />Nuclear Density Tests, each <br />30 <br />$ <br />30.00 <br />$ <br />900.00 <br />Laboratory Proctor Tests (Standard Method), each <br />3 <br />$ <br />175.00 <br />$ <br />525.00 <br />Gradation, each <br />_ <br />$ <br />85.00 <br />AS NEEDED <br />Concrete (Field Tests, Casting/Curing/Compression of Cylinders), set of 8 <br />20 <br />$ <br />200.00 <br />$ <br />4,000.00 <br />Masonry Grout (Field Tests, Casting/Curing/Compression of Specimens), set of 4 <br />8 <br />$ <br />155.00 <br />$ <br />1,240.00 <br />Masonry Mortar (Field Tests, Casting/Curing/Compression of Cubes), set of 3 <br />3 <br />$ <br />155.00 <br />$ <br />465.00 <br />Structural Steel Visual Inspection Report, each <br />1 <br />$ <br />300.00 <br />$ <br />300.00 <br />Epoxy Dowel Inspection Letter, each <br />1 <br />$ <br />150.00 <br />$ <br />150.00 <br />Firestopping Inspection Report, each <br />1 <br />$ <br />500.00 <br />$ <br />500.00 <br />EIFS Inspection Report, each <br />1 <br />$ <br />500.00 <br />$ <br />500.00 <br />Floor Flatness (On -site Inspections and Documentation), lump sum <br />1 <br />$1500.00 <br />$ <br />1,500.00 <br />Final Summary of Service Report, each <br />1 <br />$ <br />300.00 <br />$ <br />300.00 <br />Trip Charges (Travel Time & Mileage), each <br />54 <br />$ <br />90.00 <br />$ <br />4,860.00 <br />TOTAL: <br />$22,245.00 <br />Exterior Improvement Scope <br />Description <br />Qty. <br />Unit Rate <br />Extension <br />Special Inspections & Site Observations, hourly <br />4 <br />$ <br />85.00 <br />$ <br />340.00 <br />Nuclear Density Tests - Utilities/Subgrade, each <br />16 <br />$ <br />30.00 <br />$ <br />480.00 <br />Nuclear Density Tests - Aggregate Base, each <br />10 <br />$ <br />30.00 <br />$ <br />300.00 <br />Laboratory Proctor Tests (Standard Method) - Aggregate Base, each <br />1 <br />$ <br />175.00 <br />$ <br />175.00 <br />Gradation, each <br />1 <br />$ <br />85.00 <br />$ <br />85.00 <br />Concrete (Air, Slump, Casting, Curing, Compression of Cylinders), per set of 3 <br />3 <br />$ <br />145.00 <br />$ <br />435.00 <br />Bituminous Properties (Extraction, Gradation & Air Voids), each <br />2 <br />$ <br />350.00 <br />$ <br />700.00 <br />Bituminous Nuclear Density Tests, each <br />4 <br />$ <br />50.00 <br />$ <br />200.00 <br />Double Ring Infiltrometer Test (On -site Activities & Documentation), each <br />1 <br />$ <br />700.00 <br />$ <br />700.00 <br />Trip Charges (Travel Time & Mileage), each <br />10 <br />$ <br />90.00 <br />$ <br />900.00 <br />TOTAL: <br />$ <br />4,315.00 <br />PROJECT TOTAL: <br />$26,560.00 <br />Note: The scope of testing service is determined by reviewing the project plans and specifications and/or the report from <br />previous site geotechnical explorations if made available to us. The quantities are derived based on the scope and the <br />industry standard of minimum testing required. Deviations from our estimated quantities can occur if there are more soil <br />corrections than expected or if construction progresses slower than normal due to weather, contractor's equipment issues, <br />or other unforeseeable issues. <br />Page 2 <br />