ITT Proposal #11-01
<br />City of Elk River
<br />Public Safety Project Expansion Improvement
<br />Elk River, Minnesota
<br />cost Proposal:
<br />Buildinq Scope
<br />Description
<br />Qty.
<br />Unit Rate
<br />Extension
<br />Project Management, hourly
<br />8
<br />$
<br />85.00
<br />$
<br />680.00
<br />Reinforcing Bar Inspection, each
<br />20
<br />$
<br />85.00
<br />$
<br />1,700.00
<br />Special Inspections & Site Observations, hourly
<br />50
<br />$
<br />85.00
<br />$
<br />4,250.00
<br />Excavation Observation Review & Report by P.E., each
<br />1
<br />$
<br />375.00
<br />$
<br />375.00
<br />Nuclear Density Tests, each
<br />30
<br />$
<br />30.00
<br />$
<br />900.00
<br />Laboratory Proctor Tests (Standard Method), each
<br />3
<br />$
<br />175.00
<br />$
<br />525.00
<br />Gradation, each
<br />_
<br />$
<br />85.00
<br />AS NEEDED
<br />Concrete (Field Tests, Casting/Curing/Compression of Cylinders), set of 8
<br />20
<br />$
<br />200.00
<br />$
<br />4,000.00
<br />Masonry Grout (Field Tests, Casting/Curing/Compression of Specimens), set of 4
<br />8
<br />$
<br />155.00
<br />$
<br />1,240.00
<br />Masonry Mortar (Field Tests, Casting/Curing/Compression of Cubes), set of 3
<br />3
<br />$
<br />155.00
<br />$
<br />465.00
<br />Structural Steel Visual Inspection Report, each
<br />1
<br />$
<br />300.00
<br />$
<br />300.00
<br />Epoxy Dowel Inspection Letter, each
<br />1
<br />$
<br />150.00
<br />$
<br />150.00
<br />Firestopping Inspection Report, each
<br />1
<br />$
<br />500.00
<br />$
<br />500.00
<br />EIFS Inspection Report, each
<br />1
<br />$
<br />500.00
<br />$
<br />500.00
<br />Floor Flatness (On -site Inspections and Documentation), lump sum
<br />1
<br />$1500.00
<br />$
<br />1,500.00
<br />Final Summary of Service Report, each
<br />1
<br />$
<br />300.00
<br />$
<br />300.00
<br />Trip Charges (Travel Time & Mileage), each
<br />54
<br />$
<br />90.00
<br />$
<br />4,860.00
<br />TOTAL:
<br />$22,245.00
<br />Exterior Improvement Scope
<br />Description
<br />Qty.
<br />Unit Rate
<br />Extension
<br />Special Inspections & Site Observations, hourly
<br />4
<br />$
<br />85.00
<br />$
<br />340.00
<br />Nuclear Density Tests - Utilities/Subgrade, each
<br />16
<br />$
<br />30.00
<br />$
<br />480.00
<br />Nuclear Density Tests - Aggregate Base, each
<br />10
<br />$
<br />30.00
<br />$
<br />300.00
<br />Laboratory Proctor Tests (Standard Method) - Aggregate Base, each
<br />1
<br />$
<br />175.00
<br />$
<br />175.00
<br />Gradation, each
<br />1
<br />$
<br />85.00
<br />$
<br />85.00
<br />Concrete (Air, Slump, Casting, Curing, Compression of Cylinders), per set of 3
<br />3
<br />$
<br />145.00
<br />$
<br />435.00
<br />Bituminous Properties (Extraction, Gradation & Air Voids), each
<br />2
<br />$
<br />350.00
<br />$
<br />700.00
<br />Bituminous Nuclear Density Tests, each
<br />4
<br />$
<br />50.00
<br />$
<br />200.00
<br />Double Ring Infiltrometer Test (On -site Activities & Documentation), each
<br />1
<br />$
<br />700.00
<br />$
<br />700.00
<br />Trip Charges (Travel Time & Mileage), each
<br />10
<br />$
<br />90.00
<br />$
<br />900.00
<br />TOTAL:
<br />$
<br />4,315.00
<br />PROJECT TOTAL:
<br />$26,560.00
<br />Note: The scope of testing service is determined by reviewing the project plans and specifications and/or the report from
<br />previous site geotechnical explorations if made available to us. The quantities are derived based on the scope and the
<br />industry standard of minimum testing required. Deviations from our estimated quantities can occur if there are more soil
<br />corrections than expected or if construction progresses slower than normal due to weather, contractor's equipment issues,
<br />or other unforeseeable issues.
<br />Page 2