Laserfiche WebLink
it ci <br />Elk* <br />River <br />Request for Action <br />To <br />Item Number <br />Mayor and City Council <br />7.1a <br />Agenda Section <br />Meeting Date <br />Prepared by <br />Public Hearings <br />November 16, 2020 <br />Chris Leeseberg, Senior Planner <br />Item Description <br />Reviewed by <br />Preliminary Plat: Elk Ridge Estates, Contractors <br />Zack Carlton, Planning Manager <br />Capital Company, LLC, Lorraine White, 19746 <br />Reviewed by <br />Troy Street <br />Cal Portner, City Administrator <br />Action Requested <br />Approve, by motion, the Preliminary Plat for Elk Ridge Estates with <br />the following conditions: <br />1. A single sewer/water stub shall be provided to west property <br />line along Troy Street. <br />2. Staff approval of all site, civil, utility, and landscaping plans. <br />3. Include the north half of the subject site in the plat and <br />identify with a lot/block designation. <br />Background/Discussion <br />Case No. P 20-19 <br />The subject property is zoned Rlb and is located at the northeast <br />corner of 185th Avenue and Troy Street. The proposed plat will <br />consist of 23 lots, two outlots, and dedicated right-of-way. <br />CR 12 <br />Planning Commission ' <br />During the public hearing, two residents had questions regarding the <br />Troy Street easement and availably of sewer and water to the parcels �'yh <br />directly to the west was also discussed. The subdivision will provide <br />service stubs to the western property line of the proposed plat <br />allowing the Troy Street homes to connect to city services. Figure I <br />Troy Street is not a public street and this subdivision does not include right-of-way to add the road to the city's <br />street network. Additionally, the city has not plowed or otherwise maintained Troy Street and approval of this <br />subdivision would not change current maintenance practices. Extending city services to the homes along Troy <br />Street would need to be initiated by the property owners. <br />The Commission also had questions regarding how Wapiti Park would be accessed and if the street layout would <br />support fire trucks. Staff stated the main north/south street will be platted and constructed to the north property <br />line, providing future street and utility access to Wapiti Park. <br />The Elk River Vision P I I E I E U I i <br />A welcoming community with revolutionary and spirited resourcefulness, exceptional [NATURE] <br />service, and community engagement that encourages and inspires prosperity. Updated. August 2020 <br />