Laserfiche WebLink
Capital Improvement Plan <br />City of Elk River, Minnesota <br />Data in Year 2020 and 2025 <br />Bi-annual pond cleaning, stormwater repairs, BMP inventory. <br />2021 - Dodge Ave south of 8th St - Basin 197 <br />2023 - Trott Brook <br />2025 - Elk Park Center basin and Zane Street basin <br />(Storm water infrastructure projects combined with street projects are i <br /> Justification <br />These projects include the testing, removal, and disposal of sediment deposits from our stormwater ponds. This is needed to assure the storm water <br />system is functioning as designed and achieving the water quality standards of our NPDES permit. <br />The s <br /> Description <br />Project #STM-1 <br />Useful Life Unassigned <br />Project Name Storm Water Projects <br />Category Utilities <br />Type Maintenance <br />Contact Storm Water Coordinator <br />Department Storm Water <br />Total2020 2021 2022 2023 2024Expenditures 2025 <br />675,000175,000 250,000Construction/Maintenance 250,000 <br />175,000 250,000 675,000Total250,000 <br />Total2020 2021 2022 2023 2024Funding Sources 2025 <br />675,000175,000 250,000Storm Water 250,000 <br />175,000 250,000 675,000Total250,000 <br />2020-2025 CAPITAL IMPROVEMENT PLAN <br />58