Laserfiche WebLink
8.1. What is being stored? <br />Construction materials and project components. <br />(Within the outdoor storage area proposed to be moved following demolition, the materials stored <br />include transmission service -related components, such as spare substation or transmission line <br />equipment, hardware, etc.) <br />8.2. How much? <br />The space and amount of material to be stored is for the proposed project it yet to be determined. <br />(Site restoration after demolition is currently planned for the second half of 2021 and specifics are yet to <br />be determined.) <br />8.3. Proposed screening? <br />As noted in item 5 above, the proposed project, including any areas used for temporary storage near the <br />existing 200 MW combustion turbine is screened by the trees and privacy fencing on the west side of <br />Highway 169. <br />(Site restoration of the ERERS area will include replanting the hillside along Highway 10 with pollinator - <br />friendly plants. Additionally, the area of the proposed storage yard will be on top of the hill and thus <br />elevated from the view of Highway 10. The storage yard itself will likely have a six -foot -tall chain link <br />fence and will include privacy slats or screening on the Highway 10 side.) <br />Project Narrative <br />Great River Energy — Proposed Combustion Turbine Addition <br />