Laserfiche WebLink
8.1. What is being stored? <br /> Construction materials and project components. <br /> (Within the outdoor storage area proposed to be moved following demolition, the materials stored <br /> include transmission service-related components,such as spare substation or transmission line <br /> equipment, hardware, etc.) <br /> 8.2. How much? <br /> The space and amount of material to be stored is for the proposed project it yet to be determined. <br /> (Site restoration after demolition is currently planned for the second half of 2021 and specifics are yet to <br /> be determined.) <br /> 8.3. Proposed screening? <br /> As noted in item 5 above,the proposed project, including any areas used for temporary storage near the <br /> existing 200 MW combustion turbine is screened by the trees and privacy fencing on the west side of <br /> Highway 169. <br /> (Site restoration of the ERERS area will include replanting the hillside along Highway 10 with pollinator- <br /> friendly plants. Additionally,the area of the proposed storage yard will be on top of the hill and thus <br /> elevated from the view of Highway 10.The storage yard itself will likely have a six-foot-tall chain link <br /> fence and will include privacy slats or screening on the Highway 10 side.) <br /> Project Narrative 4 <br /> Great River Energy—Proposed Combustion Turbine Addition <br />