My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 20-72
ElkRiver
>
City Government
>
City Council
>
Council Resolutions
>
2020 - 2029
>
2020
>
RES 50-74
>
RES 20-72
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2020 9:55:00 AM
Creation date
10/21/2020 9:55:00 AM
Metadata
Fields
Template:
City Government
type
RES
date
10/19/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BC#9F - Painting & Walleovering <br />$106,209 <br />Virniv, paintin <br />BC#21A - Fire Suppression <br />$52,300 <br />Summit Fire Protection <br />BC#22A - Mechanical <br />$1,031,840 <br />Precise Heatin o <br />BC#26A - Electrical <br />$352,235 <br />Klein Electric <br />BC#31A - Earthwork <br />$177,400 <br />New Look Contractinv <br />BC#32A - Fencing <br />$120,375 <br />Terra will Re -Bid This Cate �ory <br />BC#32B - Landscaping <br />$42,980 <br />Autumn Rid ae Landscatline <br />BC#32C - Asphalt Paving <br />$144,740 <br />Bituminous Roadways <br />BC#32D - Curb, Gutter & Sidewalks <br />$78,700 <br />Ebert Construction <br />BC#33A - Site Utilities <br />$84,000 <br />St. Paul Utilities <br />Potential Savings / Tax Exempt <br />n/a <br />SUB -TOTAL <br />$5 799 244 <br />Add Alternate #1 - Basement HOC Room <br />$10,340 <br />Add Alternate #4 - High Speed Doors <br />$46,000 <br />NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk <br />River, Minnesota, as follows: <br />1. The prime contracts to the recommended low bidders are hereby awarded except <br />for Categories 13C#613 — Casework, BC#9D - Carpet & Resilient and BC#32A — <br />Fencing. <br />Terra will re -issue these categories to bid and receive three competitive quotes for <br />these bid categories. These bid categories are as follows: <br />BID CATEGORY <br />BUDGET AMOUNT <br />BC#6B - Casework <br />$ 83,750.00 <br />BC#9D - Carpet & Resilient <br />$ 52,125.00 <br />BC#32A - Fencing <br />$ 120,375.00 <br />2. Alternate 1 - Casework in the Basement EOC, Alternate 3- Roof Top Air Handler <br />Unit (alternative budget) and Alternate 4 — High Speed Garage Door Openers are <br />hereby selected and their costs have been included accordingly in the bid numbers <br />detailed above. <br />3. The assignment of the prime contracts to Terra Construction, Inc., is hereby <br />authorized. <br />The motion for the adoption of the foregoing resolution was duly seconded by Member <br />Christianson and upon vote being taken thereon, the following voted in favor <br />thereof: <br />and the following voted against the same: <br />WHEREUPON, said resolution was declared duly passed and adopted this 19t' day <br />of October 2020. <br />P O 11 E A E 0 I Y <br />NATURE <br />
The URL can be used to link to this page
Your browser does not support the video tag.