Laserfiche WebLink
Capital Improvement Plan <br />City of Elk River, Minnesota <br />Project # FS-03 <br />Project Name Fire Station #3 <br />2020 thru 2025 <br />Description <br />Zonstruct Fire Station #3 due to population growth and to decrease call time for the eastern part of City. <br />Department <br />Fire Stations <br />Contact <br />Fire Chief <br />Type <br />Building <br />Useful Life <br />50 years <br />Category <br />Buildings <br />Justification <br />1 fire station feasibility and facility study was conducted in 2017 to evaluate the current facilities, locations and transportation infrastructure. The <br />dry has a number of barriers that have an impact on response time including Hwy 10, Hwy 169, the Mississippi River, and the BNSF Railroad. <br />t was determined a fire station is needed on the east side of the city to reduce fire response time due to the population growth on the east side of <br />iwy 169 and the slated construction of Hwy 169 in 2024. <br />Expenditures 2020 2021 2022 2023 2024 2025 Total <br />Design 300,000 300,000 <br />Construction 7,500,000 7,500,000 <br />Total 300,000 7,500,000 7,800,000 <br />Funding Sources 2020 2021 2022 2023 2024 2025 Total <br />Capital Improvement Bonds 2,200,000 5,600,000 7,800,000 <br />TOW 2,200,000 5,600,000 7,800,000 <br />2020-2025 CAPITAL IMPROVEMENT PLAN <br />