Laserfiche WebLink
Capital Improvement Plan <br />City of Elk River, N innesota <br />Project# STM-1 <br />Project name Storm Water Projects <br />Department <br />Storm Water <br />Contact <br />Storm Water Coordinator <br />Type <br />Maintenance <br />Useful Life <br />Unassigned <br />Category <br />Maintenance Projects <br />Description <br />3i-annual pond cleaning, stormwater repairs, BMP inventory. <br />>.021 - Dodge Ave south of 8th St - Basin 197 <br />?023 - Trott Brook <br />>.025 - Elk Park Center basin and Zane Street basin <br />Storm water infrastructure projects combined with street projects are included on the pavement management CIP sheet.) <br />Justification <br />Chese projects include the testing, removal, and disposal of sediment deposits from our stormwater ponds. This is needed to assure the storm water <br />;ystem is functioning as designed and achieving the water quality standards of our NPDES permit. <br />Che smaller stormwater repairs include minor pipe upsizing, culvert replacement, manhole and catch basin repairs and fixing of washout areas <br />Expenditures <br />2020 2021 <br />2022 2023 2024 <br />2025 <br />Total <br />Construction/Maintenance <br />175,000 <br />250,000 <br />250,000 <br />675,000 <br />Total <br />Funding Sources <br />175,000 <br />2020 2021 <br />250,000 <br />2022 2023 2024 <br />250,000 <br />2025 <br />675,000 <br />Total <br />Storm Water <br />175,000 <br />250,000 <br />250,000 <br />675,000 <br />Total <br />175,000 <br />250,000 <br />250,000 <br />675,000 <br />2020-2025 CAPITAL IMPROVEMENT PLAN <br />